My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
3570
>
2900 - Site Mitigation Program
>
PR0527444
>
COMPLIANCE INFO_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2020 4:49:46 PM
Creation date
4/10/2020 4:38:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
CASE 2
RECORD_ID
PR0527444
PE
2950
FACILITY_ID
FA0018586
FACILITY_NAME
FORMER ROY KNOLL TOWING
STREET_NUMBER
3570
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14339014
CURRENT_STATUS
01
SITE_LOCATION
3570 E MINER AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Interim Soil Remediation and Sampling Work Plan <br /> Former ROY'S TOWING (Roy Knoll) <br /> 3570 East Miner Avenue,Stockton, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0. SITE DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.1. BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.2. SITE ASSESSMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.3. GROUND WATER DEPTH AND FLOW DIRECTION . . . . . . . . . . . . . . . . . . . 3 <br /> 3.0. SCOPE OF WORK AND PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 3.1. PRE-FIELD WORK ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.2. SOIL EXCAVATION AND WASTE HANDLING . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 3.3. EXCAVATION SOIL SAMPLE COLLECTION AND ANALYSIS . . . . . . . . . 6 <br /> 3.4. EQUIPMENT DECONTAMINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 3.5. REPORT PREPARATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> FIGURES <br /> Figure I -Location Map <br /> Figure 2-Site Plan <br /> Figure 3 -Estimated Lateral Extent of Impacted Soil-Remediation Plan <br /> APPENDICES <br /> Appendix A- Analytical Results of Soil Samples <br />
The URL can be used to link to this page
Your browser does not support the video tag.