Laserfiche WebLink
Conditions of Approval <br /> G%-92-9 <br /> Page 4 <br /> i. It is understood by the applicant that the District shall no <br /> be held responsible to remedy high water table problems <br /> created by the excavation. <br /> j . Landowner shall provide District with sufficient fill dirt <br /> from excavation for protection of canal or pipeline and place <br /> fill dirt as directed by District Engineering Department. <br /> k. Any irrigation service structure (District or Private) <br /> modification or installation necessitated by the proposed <br /> excavation shall be performed at the landowner' s expense. <br /> Furthermore, owner shall obtain a Structure Permit from the <br /> District prior to installing, modifying, or removing any <br /> irrigation structures on District facilities. <br /> 1. The above Conditions of Approval shall be placed on the <br /> Improvement Plan. <br /> M. The Improvement Plan, showing all District easements, shall <br /> be submitted to the District' s Board of Directors for <br /> approval and signature. <br /> 4. PACIFIC GAS & ELECTRIC <br /> a. There shall be no excavations within 10 feet of any existing <br /> PG&E poles. <br /> b. Any necessary relocation of power poles, shall be at the <br /> owner' . expense. <br />