Laserfiche WebLink
8. Develop the well by surging and bailing 150 gallons. <br /> 9. Provide locking drums and contain all soil encountered from the depth of 60 feet <br /> and below. <br /> 10. Provide locking drums and contain all steam cleaning fluids and development <br /> water. <br /> 11. All drums will be left on site and will be disposed of appropriately after the <br /> results of laboratory analysis are received. <br /> The tentative date of drilling is April 28, 1990. This date is subject to the granting of a <br /> permit by San Joaquin County prior to that time. <br /> i <br /> i <br /> 7 <br /> I <br /> 'I <br />