KEI-P88-1013 <br /> December 15 , 1988 <br /> Page 2 <br /> were removed. Between mid-August 1985 and March 1988 , at least <br /> 19 soil borings, 9 monitoring wells, 5 recovery wells, and 7 <br /> extraction wells were installed by Kleinfelder and Associates. <br /> These soil borings and wells initially delineated the zone of <br /> soil contamination. Since soil boring data are included in our <br />' previously submitted work plans, this information will not be <br /> repeated herein. The extent of ground water contamination, <br /> however, has not yet been completely defined. <br /> 1 On January 19 , 1988, and again on July 26, 1988, Kaprealian <br /> Engineering, Inc. (KEI) submitted proposals for soil and ground <br /> water remediation at the site. A proposal was subsequently <br /> 1 approved by Unocal and the pertinent regulatory agencies. soil <br /> remediation began on September 19 , 1988 . <br /> FIELD ACTIVITIES <br /> KEI's field work pertaining to soil remediation began on <br /> September 19 , 1988 and was completed on December 12 , 1988 . The <br /> area excavated in relationship to the Kleinfelder and Associates <br /> soil borings is as indicated on the Site Plan, Figure 1, <br /> attached. A total of 28 soil samples were collected and analyzed <br /> from the excavation sidewalls and bottom. These samples were <br /> used to further delineate the zone of contamination and guide <br /> soil excavation. The excavation was terminated at ground water <br />' (a depth of 53 feet) unless pit bottom samples indicated non- <br /> detectable concentrations of the contaminants sought. Two pit <br /> bottom samples were taken for each 400 square feet of surface <br /> area . one sidewall sample was taken for each 20 linear feet of <br />' excavation perimeter. The pit samples were collected from bulk <br /> material excavated by backhoe. The samples were placed in clean, <br /> 2" diameter brass tubes , sealed with aluminum foil, plastic caps <br /> and tape, and stored in a cooled ice chest for delivery to a <br /> certified laboratory. Sample locations are as shown on the <br /> attached Site Plans (Figures 2 through 16) . Pertinent final <br /> 1 excavation samples and their locations are as indicated on the <br /> Site Plan, Figure 2 attached. <br /> From September 30 through December 12 , 1988 , 103 composite soil <br /> 1 samples, labeled Al through A4 , B1 through B4 , C1 through C4 , D1 <br /> through D3 , El through E4 , X, Y, 1 through 38 , RI through R42 , <br /> R25A and R26A, were collected from a total of approximately 6, 000 <br /> cubic yards of soil excavated from the pit. Each composite <br /> consisted of four individual grab samples taken at various <br /> locations and depths ranging from one to two feet and composited <br /> as one sample by the lab. These samples were also handled and <br /> - stored as described above._ The location of composite stockpile <br /> samples are also shown on the Site Plans (Figures 3 through 16) . <br /> 1 <br /> i <br /> 1 <br />