Laserfiche WebLink
5 . No heavy equipment will travel over the S , S .J . I . <br /> pipeline without approved bridging, said bridging to _e <br /> approved between S . S .J . I .D. and the contractor. 11 <br /> 6 . No trees and/or rubbish will be disposed of or stored <br /> on the S . S .J . I .D. easement or facilities . <br /> 7 . S . S .J . I .D. will be notified 48 hours in advance of any <br /> excavation work. <br /> 8 . The landowner agrees that the existing pipeline or <br /> concrete lined canal do not presently leak and agrees <br /> that any damage will be repaired at landowner' s <br /> expense . <br /> 9 . It is understood by the applicant that the District <br /> shall not be held responsible to remedy high water <br /> table problems created by the excavation. <br /> 10 . Landowner shall provide District with sufficient fill <br /> dirt from excavation for protection of canal or <br /> pipeline and Place fill dirt as directed by District <br /> Engineering Department. <br /> 11 . Any irrigation service structure (District or Private ) <br /> moaificat.ion or installation necessitated by the <br /> proposed excavation shall be performed at the <br /> landowner' s expense . Furthermore , owner shall obtain a <br /> Structure Permit from the District prior to installing, <br /> modifying , or removing any irrigation structures an <br /> District facilities . <br /> In conclusion, I would like to reiterate that these requirements <br /> are based upon previously approved standards that were generally <br /> considered acceptable in the past and should not be construed as <br /> being all-inclusive . Each and every item is still subject to <br /> review and approval or disapproval by the District' s Board of <br /> Directors . <br /> If there are any questions , please feel free to contact me . <br /> Sincerely yours , <br /> ja,o t 17 <br /> Sam F. Bologna <br /> Engineering Department <br /> SB\vlc <br /> cc : Rick Bar--an <br /> a: \bologna\boersma. e:{c <br />