My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
413
>
2900 - Site Mitigation Program
>
PR0505861
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2020 4:30:44 PM
Creation date
4/14/2020 2:13:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505861
PE
2960
FACILITY_ID
FA0007056
FACILITY_NAME
MOUNTAIN VIEW TOWNHOMES
STREET_NUMBER
413
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
TRACY
Zip
95236
CURRENT_STATUS
02
SITE_LOCATION
413 MONTE DIABLO AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC 00 '97 12:05 AT&T FAX 9020FX P.2/3 <br /> December 2, 1997 <br /> Project 22560-203.002 <br /> Mr. Dan Lapporte <br /> Chevron Pipe Line Company <br /> 4000 Executive Parkway <br /> Bishop Ranch No. 8 <br /> San Ramon, California 94583 <br /> Re: Work Plan for Destruction of Groundwater Monitoring Wells at 425 Mr. Diablo <br /> Avenue, Tracy <br /> Dear Mr. Lapporte: <br /> EMCON is pleased to present this work plan for the destruction of the three groundwater <br /> monitoring wells at 415 Mt. Diablo Avenue, Tracy. The scope of work was developed <br /> based on San Joaquin County Public Health Services (SJCPHS) regulations and <br /> EMCON's knowledge of similar projects. <br /> SCOPE OF WORK <br /> Task 1 - Prefield Activities <br /> Before field activities begin, EMCON will arrange for the necessary field materials and <br /> equipment. EMCON will contact Underground Services Alert at least 48 hours before <br /> commencing field activities. Appropriate permits will be obtained from the SJCPHS <br /> before initiating any field work. <br /> Task 2 - Field Activities <br /> Destruction of the groundwater monitoring wells will be performed by a licensed C-57 <br /> well driller, with proof of such license and valid workman's compensation insurance on <br /> file with the SJCPHS. The well will be sounded immediately before it is destroyed to <br /> determine whether there are obstructions that will interfere with filling and scaling. <br /> Because the well casing will be left in place during sealing operations, a hole at least one <br /> foot larger in diameter than the originally drilled hole shall be excavated around the <br /> outside of the well casing to a depth of 3 feet below the ground surface, and the well <br /> casing shall be cut off 6 inches above the bottom of this excavation and removed. The <br /> FRE.1K:W 15DSTR.DOC-97kIas:l <br />
The URL can be used to link to this page
Your browser does not support the video tag.