My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
413
>
2900 - Site Mitigation Program
>
PR0505861
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2020 4:30:44 PM
Creation date
4/14/2020 2:13:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505861
PE
2960
FACILITY_ID
FA0007056
FACILITY_NAME
MOUNTAIN VIEW TOWNHOMES
STREET_NUMBER
413
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
TRACY
Zip
95236
CURRENT_STATUS
02
SITE_LOCATION
413 MONTE DIABLO AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC 08 '97 12:06 AT&T FAX 9020FX - P.3/3 . <br /> Mr. Dan Lapporte <br /> December 2, 1997 Project 22560-203.002 <br /> Page 2 <br /> three groundwater monitoring wells, MW-1, MW-2 <br /> ed by <br /> Pumping cemenVbentonite grout into the wells under pressure The grout wlebe ovum ed <br /> through a tremie pipe, backfilling the wells in one continuous operation from the bottom. <br /> The grout used to fill the well will be allowed to spill over into the excavation during the <br /> sealing operation, and fill it for a thickness of 1 foot and form a "cap" which has a <br /> diameter of at least I foot greater than the diameter of the originally drilled hole. After the <br /> sealing material has set, the excavation will be filled with clean soil. <br /> SCHEDULE <br /> EMCON will begin scheduling field activities immediately after receiving approval of the <br /> work plan by Chevron and the SJCPHS. Within I week of receipt of drilling permits from <br /> SJCPHS,EMCON will begin field activities. Field activities are anticipated to take I day. <br /> EMCON appreciates the opportunity to present this work plan and hopes we can be of <br /> continued service to Chevron. If you have any questions please contact Steve Strait. <br /> Sincerely, <br /> EMCON <br /> Steve Strait, C.E.G. <br /> Geoscienees Manager <br /> FRZ..'K:415DSTR DOC-97Vas,1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.