My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
413
>
2900 - Site Mitigation Program
>
PR0505861
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2020 4:30:44 PM
Creation date
4/14/2020 2:13:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505861
PE
2960
FACILITY_ID
FA0007056
FACILITY_NAME
MOUNTAIN VIEW TOWNHOMES
STREET_NUMBER
413
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
TRACY
Zip
95236
CURRENT_STATUS
02
SITE_LOCATION
413 MONTE DIABLO AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Don O. Culbertson Proposal P95-060.56 <br /> June 29, 1995 <br /> Page 7 <br /> SCHEDULE <br /> EMCON is prepared to begin prefield activities within 1 week of approval of this work <br /> plan by CPL and the Regional Water quality Control Board. Within 2 weeks of receipt <br /> of drilling permits from the San Joaquin County Department of Environmental Health <br /> EMCON will begin Geoprobe sampling activities. Because the results of the Geoprobe <br /> sampling program must be evaluated before the locations of the monitoring wells can be <br /> chosen, monitoring well installation will begin within 2 weeks of receipt of this data. <br /> Within 4 weeks of receipt of chemical analytical data from the Geoprobe and monitoring <br /> well installation and sampling programs, EMCON will submit a draft report to CPL. <br /> Within 1 week of receipt of CPL's comments on the draft report, EMCON will submit <br /> a final report incorporating CPL's comments. <br /> COST ESTIMATE. <br /> Table 3 summarizes the cost estimate for the proposed scope of work. The estimated cost <br /> and proposed scope of work are based on information available to EMCON at this time. <br /> If conditions change, unforeseen circumstances are encountered, or the scope of work is <br /> expanded the cost estimate may require modification. <br /> EMCON appreciates the opportunity to be of continuing service to CPL. If you have any <br /> questions regarding this work plan please contact George Forsythe or Steve Strait at (209) <br /> 275-4968. <br /> Sincerely, <br /> EMCON <br /> George Forsythe Steve Strait, R.G. <br /> Staff Geologist Branch Manager <br /> Attachments: Tables 1, 2, and 3 <br /> Figures 1, 2, 3, 4, and 5 <br /> Appendix A <br /> FRE/H\wp'proposaN"9506056.wp5-95 gtf:l <br />
The URL can be used to link to this page
Your browser does not support the video tag.