My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RUSS CHAPIN 209-464-6947 11-17-95 07:49 P.06 <br /> Mr. Russell F.Chapin, Sr. <br /> Noveiiil-rr 15, 1995 <br /> t'agr. 5 <br /> We recommend installing an internal combustion'engine unit equipped with a 15 kW <br /> 6r1kri1tt,r unit which m-4ill increase the throughput capability of the engine. it is our,iutlgmettt that <br /> clic site could make use of an internal combustion engine for a poriod not likely to cg"ed 6 to 12 <br /> ttti}itllhs, alter which it Would he appropriate to replace the engind with a blower extraction unit <br /> using activaled canyon tis the primary emissions control method.;17hr.tinting of the switch it) <br /> blower and carbon filters will he made when projected utility and carbccn costs for the blower <br /> system ,arc less than filet"d utility costs associated with the engine units. All remedial <br /> cyttipluci71 will he designed to he easily transported or stored. <br /> OPULATE AND hAMAIl-SYSTEM <br /> The system will be operated and maintained at minimun)monthly intervals with quarterly <br /> repom%of system performance, <br /> INTLIUM VERIFI ATiQN.SA.MPLING <br /> Progress sampling was requested in the request for bid,which was to consist of drilling <br /> mil horintr4 acid evaluating selected soil and/or groundwater samples. We do not recommend <br /> this lrrncedure. Varefnl monitoring of the system inlet concentrations for hydroeftrbons and other <br /> rnminetcm �aicic a,�oxygen.should allow reasonably accurate estitnxlion of The sift•PI.AWs without <br /> un-iiirccs,,ary site:disturbance by drilling and sampling operations. <br /> YERIF'IC'ATION SAMPLING <br /> Verification sampling is proposed to consist of collection and analysis of samples fmm <br /> drive-pcitnt sampling, a quick and cast-effective way of collecting undisturbed soil acid <br /> groundwater samples, The method involves hydraulically pushing a 2-in probe to collect <br /> sarnplcs The method also has the added advantage of producing no drill cuttings acid ininirniz,ing <br /> site:tii�turtynnae:. We should be Able to generate 8 to 12 or more penetrations within n day. We <br /> expect that this should be sufficient to evaluate subsurface conditions at the site. <br /> s <br /> 445l�•Pl <br />
The URL can be used to link to this page
Your browser does not support the video tag.