My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RUSS CHAPIN 209-464-6947 It-t7-95 07:50 P.07 <br /> Mr, Rowell 1�, Chapin, Sr. <br /> November 15, 19()5 <br /> PhRe 6 <br /> AND SC1t1rIHTF <br /> Work will bepiii ort t17e project as soon as possible after acceptance of this work pla;E by <br /> Sa►i Joaquin County and authorization to prctcmd is given by the site owners. Initial work will <br /> inc-lucic ncquiring perniits to crnst,vct the required groundwater,monitoring and vapor extraction <br /> w+:lls,sa►tnplc collection and analyrit,and design and permitting of the rerttedial system. These <br /> items are expcetcd to require as tittle as three weeks to as touch as 2 months to complete. The <br /> tiand operated as soon as possible after receipt of petmisSi4n to constntct <br /> ystem will he installed <br /> the unil. 'I lie intemal contbtlstion engine unit is expected to be used for at least 6 months,but is <br /> flV)poiRecl likely to be cost effective beyond one year. <br /> 1liank you fvr this opportunity to be of ecrvicc to you. <br /> Sincerely. <br /> IMSII GFOSCIENCES <br /> Andrew 1 . Dost, <br /> President <br />
The URL can be used to link to this page
Your browser does not support the video tag.