Laserfiche WebLink
RUSS CHAPIN 209-464-6947 It-t7-95 07:50 P.07 <br /> Mr, Rowell 1�, Chapin, Sr. <br /> November 15, 19()5 <br /> PhRe 6 <br /> AND SC1t1rIHTF <br /> Work will bepiii ort t17e project as soon as possible after acceptance of this work pla;E by <br /> Sa►i Joaquin County and authorization to prctcmd is given by the site owners. Initial work will <br /> inc-lucic ncquiring perniits to crnst,vct the required groundwater,monitoring and vapor extraction <br /> w+:lls,sa►tnplc collection and analyrit,and design and permitting of the rerttedial system. These <br /> items are expcetcd to require as tittle as three weeks to as touch as 2 months to complete. The <br /> tiand operated as soon as possible after receipt of petmisSi4n to constntct <br /> ystem will he installed <br /> the unil. 'I lie intemal contbtlstion engine unit is expected to be used for at least 6 months,but is <br /> flV)poiRecl likely to be cost effective beyond one year. <br /> 1liank you fvr this opportunity to be of ecrvicc to you. <br /> Sincerely. <br /> IMSII GFOSCIENCES <br /> Andrew 1 . Dost, <br /> President <br />