Laserfiche WebLink
RUSS CHAPIN 209-464-6947 11-17-95 07:50 P.06 <br /> SUMMARY OF ESTIMATED COSTS <br /> SUBSURFACE ENVIRONMENTAL INVESTIGATION <br /> CHAPIN BROS.INC,FACILITY <br /> STOCKTON,CALIFORNIA <br /> PAGE I OF 3 <br /> "TASK 1 -INSTALLATION <br /> FIELD OPERATIONS <br /> Drill 2 Vapor Extraction Wells <br /> Staff Geologist 6 hrs (a; $65 $390,00 <br /> llri llcr 1 $2,100.00 <br /> Eau'= ni <br /> Field vehicle ' 1 day $40/day $40,00 <br /> Organic Vapor Meter 1 day o s I00/day $100.00 <br /> Brass sleevss 10 a $7/ea $70,00 <br /> 1.abotatory Analyses <br /> Soil Samples 6 Cal $50 Al" <br /> s3,000.0U <br /> Drill,Construct,Dn,elop, and Sample I Groundwater Monitoring Well <br /> Staff Geologist $hrs { S65 $520.00 <br /> Driller, $1,200.00 <br /> I'icld uiRmsut <br /> Field Vehlcic I day $40/day $40.00 <br /> Organic Vapor Meter 0,5 day u 9100/day $%00 <br /> Sampling and Development Equipment $300.00 <br /> Brass sleeves 2 @ $7/ea 614,00 <br /> Laboratory Analyses <br /> Soil Samples 2 (a) s 0 5104, <br /> Design tlhd Permitting <br /> $2,224.00 <br /> Senior Engineer 4 lis (a S90 $360.06 <br /> Project Enginmr 12 hrs ( $85 $1,020,00 <br /> StaffEngineer 20 hrs a $65 st 300,00 <br /> 1.)rafter $hits $40 320,00 <br /> Administrative 4 hrs $40 $160.00 <br /> Permits $.1,400.00 <br /> Irlstell System <br /> s4,s60.00 <br /> Install Trenches(Agsumt 110 ft), compound, ICE,1AS units) <br /> Project Engineer 12 hrs $95 $1,020.00 <br /> Technician 40 hrs $55 ! $2,200.00 <br /> Field Vehicle 5 days $40 $200.00 <br /> Fxcavation Contractor <br /> 1'renching,Fencing, Concrete Slab, <br /> Piping,Backhoe <br /> 516,250,00 <br /> IruSH �it:C�S(;tENc�3:: <br />