My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RUSS CHAPIN 209-464-6947 09-05-95 08:23 P.04 <br /> second phases. Unit costs for this work should be provided. Perform <br /> effectiveness tasting to evaluate the adequacy of the- existing <br /> extraction well system of treating the known plume area and <br /> propose modification to the remedial system as may be needed to <br /> i achieve the objectives. <br /> Sia co n ti- E ase - Would be .to install additional vapor extravtion <br /> 1, wells (VEW), air recharge wells (ARW), and air sparge wells (ASW) <br /> for use In expanding the area of corrective action, install the piping <br /> system to connect these wells to the vapor extraction and treatment <br /> (VET) center, and supply the needed materials associated with this <br /> phase of work. Cost for performing this work would be submitted to <br /> the USTCFP for Pre-Approval and the unit costs per VEW/ARW/ASW <br /> and other facets of the proposed work should that already provided. <br /> f , The bidder is requested to submit an outline of their corrective <br /> action plan for these phases and a proposed schedule for <br /> Implementing these two phases. Of specific interest is the <br /> operation of the first phase before moving into the second phase, <br /> This work must be performed in accordance with local, state, and <br /> federal regulations and guidelines that are applicable to this work. <br /> TASK 1: PROJECT PREPARATION <br /> • Conduct a site background investigation to obtain the information <br /> necessary to carry out the tasks required for this corrective <br /> action work. <br /> • Prepare a Health and Safety (H&S) Plan. <br /> • Prepare RAP and work schedule pursuant to the Guidelines <br /> • Submit the H&S Plan, RAP, and work schedule to SJCDEH for <br /> review. <br /> • Obtain well permits as needed for the second phase of corrective <br /> action. <br /> t <br /> • Obtain APCD permit fgr operation of vapor extraction system <br /> R through the second phase of corrective action. <br /> • Prepare a site closure, work pian proposing well abandonment <br /> procedures <br /> TASK 2: REMEDIAL EOUIPMENT. MATERIALS, AND SUPPLIES <br /> I • Corrective action equipment and cost for purchase/lease., <br /> • Corrective action material and supplies that may be needed to <br /> accomplish the cleanup goals. <br /> t <br /> page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.