My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RUSS CHAPIN 209-454-5947 09-05-95 08:23 P.05 <br /> • To include at least the following: <br /> Thermal or Catalytic Oxidizer or Internal Combustion Engine <br /> Moisture Separator <br /> - Manifold System - to connect wells <br /> Security Fence <br /> TASK 3: REMEDIAL SYSTEM INSTALLATION AND STARTUP <br /> • One new vapor extraction well, one new monitoring well, develop <br /> the monitoring well, test soil and water from these new wells <br /> • Install the electrical and natural gas utilities for operating the <br /> VETS <br /> • Install trench and underground piping system (include contractor <br /> and consultant supervision) <br /> VETS equipment installfation <br /> • VETS startup & initial air sample testing <br /> • Well and trench location survey and map preparation <br /> TASK,4: VAPOR EXTRACTION EFFECTIVENESS TESTING <br /> • Perform a vapor extraction effectiveness test of the existing <br /> ' I extraction system and use the results to prepare final remedial <br /> design plan. <br /> • For bidding purposes, assume one new vapor extraction well and <br /> one new ,groundwater monitoring well will need to be installed. <br /> TASK 5: REMEDIAL SYSTEM OPERATION AND MAINTENANCE <br /> • Electrical Utilities - estimated monthly cost <br /> Natural Gas Utilities - estimated monthly cost <br /> • Equipment Maintenance - estimated monthly cost <br /> TASK 6: REMEDIAL SYSTEM&GROUNDWATER MONITORING <br /> A) VETS monitoring shall be performed on a routine basis to <br /> evaluate the progress of source reduction and cleanup and should <br /> include were applicable (but not be limited to); <br /> • Field monitoring & Sample Collection (min. 2 events/month) <br /> • Air Sample Testing (min. 1 sample/month) <br /> • Quarterly monitoring reports shall be prepared and submitted to <br /> SJCDEH, APCD, and to OWNER/OPERATOR, <br /> B) Groundwater monitoring shall be performed four times a year <br /> (March, June, September -and December) to evaluate the progress <br /> of source reduction, track the hydrocarbon plume, artd,.should <br /> include (but not be limited to): <br /> • groundwater monitoring well purge & sample collection (5 wells) <br /> p;ige 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.