My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:26:54 PM
Creation date
4/15/2020 2:08:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RUSS CHAPIN 209-454-6947 10-10-94 07:49 P.02 <br /> T—;74 FRI 1-_-% .,27 bIAL.LACE—I:UIIL. & F3S$OC - <br /> 9163T2906'S P.Q2 <br /> octobor 7, 1994 <br /> To: Mr, Russell Chapin, Sr. <br /> From: Matthew Taylor— <br /> subject; Sumttlary of Conversation wtlh Mr, George Lockwood <br /> Final Remediation Plan, <br /> 1766 Monte Diablo Avenue, Stockton <br /> At your request, I will attempt to sunimari7e my telephone conversation with <br /> Mr, Oeorge Lockwood on October 7, 1994. 1 spoke with Mr. Lockwood to general terms(not being <br /> site speciflc). My question to Mr. Lockwood was based on Appendix A - Reports of the <br /> Tri-Regional Board Staff Recommendations For Preliminary Investigation and Evaluation of <br /> Undc,rgronnd Tank Sites, specifically the Final ReniWipl Plan (FRP) - Section 2835 on pages A-13 <br /> and A-14 and Figure A-L I asked Mr. Lockwood does the pilot testing and feasibility study have <br /> to he completed as part of the PAR7 He said that it is stated in Appendix A that prellminary pilot <br /> testing and feasibility studies are apart of the PAR, however, some responsible parties(RP's)butlioe <br /> In their workplan and pioposal that pilot testlnk and the feasibility study are to bea part bf the YRP. <br /> He also said that the FRP can inciude all tasksto implementation of a treatment system to drilling <br /> conflrroaallon toll borings!lie Bald theI 4x 'illty in tete rcpordng process to minimize tho bid <br /> process for the RP, Mr. Lockwood said that he would be wllling to answer any specific questions <br /> 1 may have regarding a specific site and outlining tasks for the F. <br /> I would like to discuss this in more detail with Eric on Monday so that we can better help you and <br /> make sure that our proposed scope of work Includes all that you asked for and need. Hopefully we <br /> will be able to have a conference call. between Eric, you and I on Monday to further discuss this <br /> Issue and help you in your effort. <br /> ,r <br />
The URL can be used to link to this page
Your browser does not support the video tag.