My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:19:53 PM
Creation date
4/15/2020 3:15:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/07/2004 14:41 20946-71118 AGE STOCKTON PAGE 07/10 <br /> 07 June 2001 <br /> AGE-NC Project No. 95-0103 <br /> Page 3 of 6 <br /> data from the wells. The height of the water column above the datalogger was measured at one <br /> minute time intervals. The depth-to-groundwater was also measured in selected wells during the <br /> pump test using a Solinst water level meter. <br /> During the constant rate pumping test (3 gpm), the maximum ground water drawn-down in <br /> extraction well VE-6 was observed to be approximately 1.0 feet after 300 minutes of pumping; <br /> maximum draw-down was observed in wells T1 (Located 5 feet toward the east)at 2.7 feet after 700 <br /> minutes of pumping; draw-down was observed in well T2 (located l.5 feet toward the south)at 1.5 <br /> feet after 700 minutes, draw-down was observed in vapor well VW-1 (located 30 feet toward the <br /> southeast) at 0.85 feet after 700 minutes of pumping and no measurable draw-down was observed <br /> in well MW-3 (located 50 feet toward the west). Water level records arc in Appendix B. <br /> Constant Rate Drawdown. Test- 29 March 01 <br /> During the constant rate drawdown pump test of 29 March the depth-bo-ground water was measured <br /> in the test extraction well MW-4, monitoring well MW-1 and vapor extraction well VW-7,using a <br /> Solinst water level meter.Solinst Levelogger pressure transducers were placed in MW-1,VW-7 and <br /> MW-4. Monitoring well MW-4 is screened from 15 to 35 feet bsg; vapor well VW-7 is screened <br /> from 5 to 1.5 feet bsg;monitoring well MW-1 is screened from 20 to 40 feet bsg and observation well <br /> MW-7 is screened from 10 to 30 feet bsg. The height of the water column was measured by the <br /> datalogger at one-minute time intervals.Pumping began at one gpm,after 120 minutes the pumping <br /> rate was increased to approximately two gpm.Approximately 1,440 gallons of water were removed <br /> from MW4 during the 12 hour test. <br /> During the increased rate pumping test (2 gpm), the maximum ground water drawn.-down in <br /> extraction well MW-4 was observed to be approximately 5.8 feet after 700 minutes of pumping; <br /> maximum draw-down was observed in wells MW-7 (located 30 feel:toward the east) at 0.52 feet <br /> after 700 minutes of pumping operation; draw-down was observed in well MW-1 (located 40 feet <br /> toward the north) at 0.63 feet alter 700 minutes. Water level records are in Appendix C. <br /> 2.2. AQUIFER PUMPING ANALYSIS <br /> The maximum, ground water draw-down in the observation wells for each pump test was plotted <br /> against the distance of each well from the extraction point on semi-Logarithmic paper.Utilizing the <br /> Distance-Drawdown Method (Jacob straight-line method), general. transmissivity, storativity and <br /> hydraulic conductivity values were determined. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.