My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:19:53 PM
Creation date
4/15/2020 3:15:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
28 June 2001 <br /> AGE-NC Project No. 95-0103 <br /> Page 9of9 <br /> Samples will be obtained and analyzed from the discharge line to evaluate the effectiveness of the <br /> treatment system. If the analytical results do not indicate the detection of hydrocarbon compounds <br /> above the allowable discharge limit, AGE will request the City of Stockton to allow continuous <br /> discharge directly from the treatment system into the sanitary sewer conveyance. GAC filter-media <br /> phase will be replaced once the detection of hydrocarbon compounds are above the allowable <br /> discharge limits, in samples analyzed from the treatment system. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.