My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2020 3:19:53 PM
Creation date
4/15/2020 3:15:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MW-2 <br /> MW-6 MONTE DIABL� AVENUE <br /> SIDEp1 K <br /> L'1 <br /> VE-5 <br /> CHPI VE-8 MW-1 <br /> • <br /> CBI <br /> ASO-1 <br /> • VW-13,.t- <br /> CHPB *AS-1 CB2 <br /> VE-34 MW-7 <br /> MW-4 <br /> . BI1/WP6 CHSp VE-1 <br /> MW-3 VE-2 VW-7 <br /> m <br /> C-1 B13/WP8 <br /> O ITS <br /> Z, C <br /> CB4/CHP4 9 g <br /> 9 <br /> •CHP2 9 <br /> B6/WPI GC� <br /> G� atz/WP7 <br /> i <br /> CHPB <br /> CHP5C <br /> VES UNIT <br /> MW-5 <br /> :CHPS <br /> • <br /> 87 CHPI <br /> O CB3 <br /> B10/WP5 CHP9• <br /> CHP3 B9/WP4 , <br /> • <br /> a8/WP3 <br /> LEGEND <br /> ®BUILDING <br /> MW-1 MONITORING WELL LOCATION <br /> ASO-1 AIR SPARGING OBSERVATION WELL <br /> IAS-1 AIR SPARGING INJECTION WELL <br /> VW-1 0 VAPOR EXTRACTION WELL N <br /> S 3*VAPOR EXTRACTION & AIR SPARGING OBSERVATION WELL <br /> O-2 <br /> AS <br /> PROPOSED GROUND WATER EXTRACTION WELLS SCALE <br /> B8/WP3 • SOIL BORING 0 40 80 <br /> CBI O CONFORMATION SOIL BORING <br /> CHPI • CONFORMATION HYDRO PUNCH BORING FEET <br /> SITE PLAN ® Jdvaneed <br /> GeoEnvironmental, Inc. <br /> C HA P I N BROS., INC. of Nor4bern cBuforR:o <br /> 1766 M/-OTjNTE DIABLO AVENUE PROJECT NO.AGE-NC-95-0103 FILE: CHAPIN FIGURE: <br /> STOCKTON, CALIFORNIA DATE: 06 DECEMBER 2000 DRAWN BY: MAC 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.