Laserfiche WebLink
SID S's ALK <br /> VE-5 � <br /> LEGEND C131®BUILDING MW 1 O <br /> VE-6 <br /> MW_l MONITORING WELL LOCATION <br /> ASO-1 , AIR SPARGING OBSERVATION WELL <br /> IAS-1 AIR SPARGING INJECTION WELL ASO— <br /> VW-1 0 VAPOR EXTRACTION WELL I/w-1 <br /> VE-3 ? VAPOR EXTRACTION AS-1 <br /> ASO-2 AIR SPARGING OBSERVATION WELL <br /> B8/WP3 SOIL BORING <br /> CBI O CONFORMATION SOIL BORING V —3 <br /> CHPI ,01 CONFORMATION HYDRO PUNCH BORING <br /> (EW-1) YT PROPOSED GROUND WATER EXTRACTION WELL MW-4 <br /> CB <br /> CB50 O <br /> Z }� VE-1 0VW-7 <br /> Y \ <br /> G VE 2 <br /> N <br /> a <br /> 9 <br /> �G <br /> C� <br /> G <br /> CT1 <br /> GROND WATER <br /> EXTRACTION TREATMENT ECLOSURE <br /> O <br /> 00 <br /> B12/WP7 <br /> 4 <br /> CHP8 <br /> RAW WATER INLET HP5C <br /> 750-GALLO <br /> SETTELING NK HP5 <br /> t i <br /> 1 ' <br /> i <br /> I <br /> �I 2,000-LBS <br /> CARBON VESSEL N <br /> WATER TREATMENT 1V <br /> LINES/DISCHARGE SCALE <br /> 0 25 50 <br /> I <br /> FEET <br /> REMEDIATION PLAN ® 4dvaDeed <br /> GeoEnvironmental, Inc. <br /> CHAPIN BROS. , INC. OfNorthCro 04010 IR <br /> 1766 MONTE DIABLO AVENUE PROJECT N0. AGE-NC-95-0103 FILE: CHAPIN FIGURE <br /> STOCKTON, CALIFORNIA DATE: 15 MAY 2001 DRAWN BY: MAC 3 <br />