Laserfiche WebLink
MW-2 <br /> AVENUE <br /> SIDE"p1'K D <br /> VE-5 <br /> CHP? VE-8 MW-1 <br /> CBI <br /> ASO-1 <br /> •CHPB VW-1 *AS-1 <br /> !7 3< <br /> VE-3* <br /> MW-4 <br /> 9 <br /> • B11/WP8 CB500 VE-1 + <br /> MW-3 VE-2 VW-7 <br /> Vis, B13/WI'Fi <br /> O9 <br /> CB4/CHP4 9 <br /> �l <br /> •CHP2 9 <br /> BB/WPI <br /> B12/WP7 <br /> • <br /> CHP8 <br /> CHP5C <br /> VES UNIT <br /> MW-5 *CHP5 <br /> • <br /> CHPI <br /> CHP9 <br /> BIO/WP5 • <br /> 39/WP' , <br /> CHP3 <br /> • <br /> BB/WP3 <br /> LEGEN <br /> ®BUILDING <br /> MW-1 MONITORING WELL LOCATION <br /> ASO—I , AIR SPARGING OBSERVATION WELL <br /> TAS-1 -*AIR SPARGING INJECTION WELL AST <br /> yyVW-1 0 VAPOR EXTRACTION WELL 1\V� <br /> ASO 2 VAPOR EXTRACTION k AIR SPARGING OBSERVATION WELL <br /> SCALE <br /> PROPOSED TEMPORARY GROUND WATER ELEVATION MONITORING POINTS <br /> 0 40 <br /> BB/WP3 SOIL BORING - <br /> CB1 O CONFORMATION SOIL BORING PROPOSED SOIL BORING <br /> CHPI • CONFORMATION HYDRO PUNCH BORING FEET <br /> SITE PLAN 4dva'aced <br /> GeoEnvironmental, Inc. <br /> CHAPIN BROS., INC. Lpo afNoj-teUo cB..fao:B <br /> 1766 MONTE DIABLO AVENUE PROJECT NO.AGE-NC-95-0103 FILE: CHAPIN FIGURI' <br /> STOCKTON., CALIFORNIA DATE: 06 DECEMBER 2000 DRAWN BY: MAC 2 <br />