My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILMA
>
467
>
1600 - Food Program
>
PR0545219
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2020 10:49:58 AM
Creation date
4/21/2020 2:37:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0545219
PE
1623
FACILITY_ID
FA0025709
FACILITY_NAME
SHEBOBA'S
STREET_NUMBER
467
Direction
N
STREET_NAME
WILMA
STREET_TYPE
AVE
City
RIPON
Zip
95366
CURRENT_STATUS
01
SITE_LOCATION
467 N WILMA AVE STE #3
P_LOCATION
05
QC Status
Approved
Scanner
JCastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N Environmental Health Department <br /> - --COU NTY-- <br /> The EHD must be kept informed of the construction progress. A final inspection must be performed, <br /> operating permit fees paid, and approval to operate granted prior to opening for business. All <br /> equipment must be installed and thorough cleaning completed prior to the final inspection. <br /> Inspections must be scheduled at least 48 hours in advance. Charges for additional inspections, re- <br /> inspections and/or consultations may be assessed at the EHD hourly rate of $ 152 per hour. <br /> Any item(s) inadvertently overlooked in the plan check process, which is not in compliance with <br /> applicable State laws, and/or city or county ordinance codes, shall be constructed or reconstructed <br /> upon request of the EHD. Inferior workmanship, equipment, or materials will not be accepted for the <br /> construction or operation of a food facility. Any variance from the requirements outlined in this letter <br /> will require written approval from the EHD. Approval of the submitted plans shall become null and <br /> void if the work authorized is not commenced within 180 days from the date of approval, or the work <br /> authorized by such plans is abandoned. In order to renew action on. an expired plan approval, the <br /> applicant shall submit fees equal to that of a new plan review. A copy of the approved plans shall be <br /> available on site at the time of final inspection. <br /> If you have any questions, please contact Gigi Fahmy, Registered Environmental Health Specialist, at <br /> (209) 953-7698. <br /> Sincerely, <br /> Jeff Carruesco, RENS, RDI <br /> Program Coordinator <br /> 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.