Laserfiche WebLink
This information must be kept current at all times. Immediately update the contingency plan for this <br />facility to include all of the necessary information and submit a copy of the plan to the EHD by <br />February 9, 2014. REPEAT VIOLATION <br />Violation #135 - Failed to submit a written response within 30 days of receiving an inspection <br />report <br />The Return to Compliance paperwork for the August 19, 2013 inspection was not submitted. A <br />deficiency letter was issued on December 2, 2013. The operator of the site or facility which receives <br />an inspection report shall submit a written response to the department or the local officer or agency <br />within 60 days of receipt of the inspection report, or with a shorter time as the department or local <br />agency requires. This response shall include a statement documenting the corrective actions that <br />have been or will be taken by the operator. Immediately submit all necessary follow up paperwork for <br />the 2013 hazardous waste generator inspection to the EHD. REPEAT VIOLATION <br />Page 2 of 2 <br />