My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1990-2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
2300 - Underground Storage Tank Program
>
PR0231130
>
COMPLIANCE INFO_1990-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:22:05 AM
Creation date
4/27/2020 12:23:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990-2001
RECORD_ID
PR0231130
PE
2361
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
01
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231130_3555 W HAMMER_1990-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERING CORPORATION <br />PROJECT # 90-1217 <br />QUICK STOP MARKET #132 <br />355�West Hammer Lane <br />Stockton, California <br />SEP 11 199Q <br />f_" ;",`i ,QPWOENTAL HEALTH <br />P[IiMIT/SERVICES <br />Telic Engineering Corporation Scope of Work to be performed <br />at this site. <br />I. Removal of product and vapor recovery lines, and also <br />the removal of the fibertrench. <br />II. New installation is to be constructed using the <br />following: <br />A. Product lines are to be 2" Ameron Dualoy 3000/L <br />fiberglass pipe and fittings using the tite flex <br />flexlines and OPW 10-R series emergency shut off <br />valves. <br />B. Secondary containment is to be Ameron 3" Dualoy R <br />3000/L pipe and fittings using containment tubs at <br />the tanks. For the product riser at the island there <br />are two (2) options: <br />1. Using Ameron 3" fiberglass pipe with two (2) <br />45' s bringing the containment to an above grade <br />level. <br />2. Using a Titeflex Gardflex soil safe flex <br />connector. <br />C. Secondary containment monitoring is to be Leak Alert <br />Q0001-001 Liquid Sensor placed in the containment tub <br />at the tank, and wired back to existing Leak Alert <br />monitor. <br />D. Vapor Recovery will be 2" Ameron Dualoy 3000/L <br />fiberglass pipe fittings with titeflex flex lines at <br />the island installed with 1/4" per foot slope back <br />to the tank. <br />III. Testing performed will be: <br />Product lines will be air pressure tested. <br />LIC. # A 569559 POST OFFICE BOX 2076 STOCKTON, CALIFORNIA 95201 209 / 465-2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.