Laserfiche WebLink
i <br />ENGINEERING CORPORATION <br />Project #90-1217 <br />Quick Stop Markets <br />Page 2 <br />Secondary containment will be water tested or pressure <br />tested as required. <br />Vapor Recovery will be air pressure tested and will be <br />blockage tested per A.P.C.D. requirements. <br />Existing vent lines will be tested for blockage before <br />re -installation at the tank. <br />Existing tanks will be precision tested upon completion <br />of construction. <br />If there are any questions or changes regarding the Scope of <br />Work, please contact me at ( 209 ) 464-9055 at your convenience. <br />Sincerely, <br />TELIC ENGINEERING CORPORATION <br />Bill Irons, Superintendent <br />BI/df` <br />LIC. # A 569559 POST OFFICE BOX 2076 STOCKTON, CALIFORNIA 95201 209 / 465-2000 <br />