My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1990-2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
2300 - Underground Storage Tank Program
>
PR0231130
>
COMPLIANCE INFO_1990-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:22:05 AM
Creation date
4/27/2020 12:23:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990-2001
RECORD_ID
PR0231130
PE
2361
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
01
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231130_3555 W HAMMER_1990-2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 TELIC ENGINEERING CORPORATION (TEC) STANDARD OPERATING <br />PROCEDURE (SOP) # 89-005 <br />GENERAL GUIDELINES FOR UNDERGROUND TANK REMOVAL <br />I. UNDERGROUND STORAGE TANK REMOVALS <br />The following procedures should be used prior to the removal <br />of any underground tank that previously stored a flammable or <br />combustible liquid. In addition, the procedures outlined <br />below must be followed to ensure that the entire preparation <br />and removal operation is conducted in a safe manner and the <br />possibility of an explosive incident is minimized. <br />A. Plan Review/Schedule of Removal <br />The following sequence is required to ensure prompt and <br />successful removal inspections: <br />* Upon receipt of the approved plans from <br />Environmental Health, forward one set to the Local <br />Fire Department, and one set to the local building <br />department. <br />* At least 2 working days prior to the removal of <br />underground storage tank(s), contact the local Fire <br />Prevention Field Department and Health Department. <br />B. Removal/On-site Procedures <br />* Telic Engineering Corporation shall ensure that all <br />flammable liquids/materials have been removed from <br />the tank(s) by means of an approved vacuum truck <br />prior to excavation. <br />* Under no circumstances shall welding equipment, <br />torches or any device capable of acting as an <br />ignition source be located within 50 feet of the <br />tank to be inerted. <br />* Underground tanks that previously contained Class <br />I or II flammable liquid shall be inerted prior to <br />excavation. <br />* The top of the tank shall be exposed to provide <br />access to all of the tank openings. <br />* Any piping containing product shall be carefully <br />disconnected and the contents shall be disposed of <br />in an approved manner. All piping associated with <br />y� "the underground tank shall be removed and disposed <br />IN' <br />of . 1-0 h&LV � <br />* Remove all possible products from the tank by means <br />of an approved pump with suction resting on the <br />bottom of the tank. All products shall be properly <br />disposed of.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.