My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
2300 - Underground Storage Tank Program
>
PR0231400
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
4/27/2020 12:24:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231400
PE
2361
FACILITY_ID
FA0003539
FACILITY_NAME
S B GAS & MARKET
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23309031
CURRENT_STATUS
01
SITE_LOCATION
515 W ELEVENTH ST STE 301
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231400_515 W ELEVENTH_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARB Approved IOM—Healy ase II EVR System—VR-201-A(7513 Serie ose) Page 23 <br /> Healy Model 75B Series Inverted Coaxial Hoses <br /> 1.0 Healy Model No. 75B Series Coaxial Hose <br /> Healy 75B Series Hoses and Hose Assemblies should be serviced by a Healy Certified <br /> Technician. Hoses should be inspected for kinks, flat spots, abraded outer cover (wire <br /> strands visible) and leaking fittings on a weekly basis. <br /> Note: The following procedures shall be conducted after installation or repair, <br /> with the dispenser authorized and ready to dispense fuel. <br /> 1.1 Field Serviceable Hose Components <br /> 1.1.1 Healy Part No. HB-2 O-ring (Item 1, in Figure below). This o-ring seals the fitting <br /> to the nozzle and the adapter. Liquid gasoline visible on the hose indicates a <br /> damaged or improperly installed HB-2 o-ring. Replace the o-ring, if necessary. <br /> 1.1.2 Healy Part No. HB-4 Quad Seals (Item 2, in Figure below). These quad seals <br /> are used on the end of the hose that attaches to the breakaway assembly (or <br /> flow limiter, if equipped). If the symptom is meter creep (gallons dispensed <br /> display on dispenser is counting up when the nozzle is not dispensing gasoline), <br /> check the HB-4 quad seals at the breakaway (or flow limiter, if equipped) end of <br /> the hose for cuts or damage. Replace the seals, if necessary. <br /> 1.1.3 Healy Part No. 291 O-ring (Item 3, in Figure below). These o-ring seals are used <br /> on the end of the hose that attaches to the nozzle or hose adaptor assembly. If <br /> the symptom is meter creep (gallons dispensed display on dispenser is counting <br /> up when the nozzle is not dispensing gasoline), check the 291 o-rings at the <br /> nozzle or adaptor end of the hose for cuts or damage. Replace the seals, if <br /> necessary. <br /> Lubricate any o-ring or Quad Seal before installing the hose assembly into an adaptor, <br /> breakaway or nozzle assembly to make it easier to install and prevent the seal from <br /> getting cut. Motor oil (any weight) is acceptable for lubricating an o-ring or Quad Seal. <br /> Rule of Thumb: O-rings to Nozzle and Hose Adaptor <br /> Quad Seals to Breakaway(or Flow Limiter) <br /> 2 3 <br /> Healy Systems, Inc. Website: http://www.healysystems.com <br /> 18 Hampshire Drive Email: sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone: 603.882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual (April 8, 2005) Fax: 603.882.5189 <br /> Healy Systems, Inc. —the innovative leader of Stage 11 vapor recovery equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.