Laserfiche WebLink
ARB Approved IOM—Healy ffase II EVR System—VR-201-A(75B Serielose) Page 24 <br /> 1.2 Healy Model No. 75B Series Coaxial Hose Breakaway <br /> 013PEND <br /> MEALY STAGE li VAPOR'RECOVER'Y.._' (HOE ADASER TO <br /> PART NO.6701W BREAKAWAY(HOSE B -�. (NOSE ADAPTOR <br /> ASSEM13LY a INSTALLATION INSTRUCTIONS <br /> s <br /> ® The Healy Breakaway is delivered loosely assembled. Handle Q—rings <br /> carefully to avoid dropping and/or losing the precision parts. Igh all as 4 <br /> ■ Failure to remove the Shear screw(Item 1)as described in <br /> wn <br /> Step 1 below could result in fracturing or shearing of the screw <br /> The Shear screw will require replacement if damaged. <br /> ■ Be sure to assemble parts in the exact sequence as shown below. <br /> ■ Be sure to lubricate all o—rings and quad seals where indicated. <br /> Use of ordinary motor oil is sufficient. PIGTAIL <br /> ■ Do not use thread—sealing compounds on straight threads. <br /> ASSEMBLY INSTRUCTIONS 4 <br /> (refer to diagram at right) <br /> STRAIGHT <br /> 1. Remove the Shear Screw(Item 1) and the packing materials. THR D <br /> Separate the halves of the breakaway assembly, retaining the g <br /> loose internal valves, (Items 2&3)and the spring(Item 13) <br /> Inside the upper half. 5 <br /> 2. Select the pigtail, (whip hose) assembly. Lubricate the quad 13 <br /> and o—ring seals(Items 4, 5, 8. &straight thread, Item 6). <br /> Assemble the pigtail to the input half of the Breakaway(Item 7) 14 <br /> being sure that the larger end of the conical spring Is centered Quad rings <br /> in the groove an the white valve. Tighten hose to Breakaway at install as 2 <br /> 35 foot pounds. Be sure the vapor tube fitting slides easily into shown <br /> Iters 2 before final tightening. <br /> 3. Select the delivery hose, lubricate the a—ring (Item 4), the quad 7 <br /> seal (Item 5) and straight thread(Item 6). Assemble the end with <br /> the quad seal to the output half of the Breakaway(Item 10), BREAKAWAY <br /> install the secondary hose and tighten to 35 foot pounds. Be aware 12 <br /> the vapor tube fitting elides easily into item 3 before final tightening. , ALIGNMENT <br /> PIN <br /> 4. Carefully fit both halves of the Breakaway together. Utlizing <br /> the alignment pin, fully compress both holves and insert the _ 1 <br /> Shear Screw(Item 1)and hand tighten. Final tighten to 20 SPARE <br /> inch pounds. Tools should not be necessary to initially start <br /> the screws. 10 <br /> 11 <br /> 14 2 1-117 0-MB6 PRW=N 0727 708 3 <br /> 13 1 MM-752 WMN06 OIXBCAL <br /> 12 1 1-122 0-110111 PRW30" iisw7 700 14 <br /> 11 2 701-312 0-1101%PRWWN OM7 5 <br /> 1 m NOZZLE END Quad rings <br /> e a 1-012 0-n014 PREa310N W47 201 install as <br /> 7 1 a7o1-740 SM.DISPENOR END 740 shown <br /> e 2 N=nnnw6 <br /> 5 4 4012 0I -WING 514w Neo 4 <br /> 4 4 1 28 0--1014%PRmOgNA747 N®Y HOSE <br /> ] @6701-781 vALT6 NOZZLE ENO 701 <br /> 2 1 MIM-7411 NAI.ME NO ENO 746 <br /> 1 2 BM-718 014ra4R,WL 787 <br /> 1=N0. ow VWQ N0. DESCRFM P/N <br /> L187'�NAIEAUI4 <br /> PRODUCT-TO NOZZLE-END <br /> Healy Systems, Inc. Website: http://www.healysystems.com <br /> 18 Hampshire Drive Email: sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone: 603.882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual (April 8, 2005) Fax: 603.882.5189 <br /> JFKWJ <br /> Healy Systems, Inc. —the innovative leader of Stage 11 vapor recovery equipment <br />