Laserfiche WebLink
ARB Approved IOM—Healy Phase I I EVR*stem—VR-201-A(Br6akaway—8701 VV)* Page 29 <br /> 7. Remove the shear pin (#787) located in the spare shear pin location of the breakaway and install in <br /> place of the original. <br /> 8. Torque the shear pin to to 20 inch-pounds (— 1.5 ft-lbs). DO NOT OVER-TIGHTEN. <br /> 9. If available, install a shear pin (#787) in the spare shear pin location. <br /> 10. Remove the Breakaway Reconnection Clamp. <br /> 11. Proceed with the tests outlined in Section 1.4 of the Healy Systems Scheduled Maintenance. <br /> Figure I Figure 2 <br /> Top Clamp Shear Pin Bushing Hole <br /> Dowel Pin <br /> Shear Pin Installation <br /> Spare Shear <br /> Bottom <br /> Pin <br /> Healy Systems, Inc. Website: hftp://www.healysystems.com <br /> 18 Hampshire Drive Email: sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone: 603.882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual (April 8, 2005) Fax: 603.882.5189 <br /> 1 W" <br /> Healy Systems, Inc. —the innovative leader in Stage 11 vapor recovery equipment <br />