My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
515
>
2300 - Underground Storage Tank Program
>
PR0231400
>
COMPLIANCE INFO_2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
4/27/2020 12:24:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0231400
PE
2361
FACILITY_ID
FA0003539
FACILITY_NAME
S B GAS & MARKET
STREET_NUMBER
515
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23309031
CURRENT_STATUS
01
SITE_LOCATION
515 W ELEVENTH ST STE 301
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231400_515 W ELEVENTH_2006-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARB Approved IOM-Healy Phase I I EV stem-VR-201-A(Breakaway-8701 We <br /> Page 28 <br /> DRIVE-OFF BREAKAWAY RECONNECTION PROCEDURE <br /> Use this procedure to either reconnect or disconnect (reverse order) the Healy 8701W Breakaway as part of <br /> Section 1.4 Procedure for Reconnecting Breakaway and Testing Fueling Point after Drive-Off in the Healy <br /> Systems Scheduled Maintenance. <br /> Note: Breakaway Reconnections; must be logged in the GDF Maintenance Log. <br /> TOOLS NEEDED: <br /> • Healy Breakaway Reconnection Clamp, Part No. 795 <br /> • 8mm Hex Head Socket <br /> • Torque wrench <br /> • Safety glasses <br /> RECONNECTION PROCEDURE <br /> 1. Inspect each half of the separated breakaway for obvious damage to the outer-shell, plastic inserts or <br /> o-rings; including cracks, chips or tears that may effect reconnecting the two halves. <br /> 2. Check the shear pin bushing hole (see Figure 2, on page 29) located in the top half of the breakaway <br /> for any part of the pin left behind at separation. A gentle tap on the opposite side of the breakaway <br /> should eject the pin. <br /> 3. After completing inspection, lightly lubricate the main o-ring on the top half of the breakaway. Any <br /> weight motor oil is acceptable. <br /> 4. Slide the top clamp of the Breakaway Reconnection Clamp onto the two flat surfaces on the top half of <br /> the breakaway (See Figure 1, on page 29) installed on the dispenser (attached to whip hose). <br /> 5. Slide the separated bottom half of the breakaway (with hose and nozzle attached) onto the bottom <br /> clamp of the Breakaway Reconnection Clamp and begin squeezing the grip to slowly bring the two <br /> halves together. Check the main o-ring for position as the top and bottom of the breakaway come <br /> together. <br /> 6. Align the dowel pin in the bottom half of the breakaway with the dowel pin guide located in the top half <br /> of the breakaway. When dowel pin and guide are aligned, continue squeezing tool grip until the <br /> breakaway halves come together. <br /> Caution: Reconnection can cause a small amount of gasoline to leak out of the breakaway. A <br /> towel wrapped loosely around the breakaway can help to minimize fuel spills. <br /> Healy Systems, Inc. Website: http://www.healysystems.com <br /> 18 Hampshire Drive Email: sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone: 603.882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual (April 8, 2005) Fax: 603.882.5189 <br /> IMAW1 <br /> Healy Systems, Inc. -the innovative leader in Stage 11 vapor recovery equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.