Laserfiche WebLink
Kennedy/Jenks Consultants <br /> Section 6: Schedule <br /> Kennedy/Jenks will schedule the field activities following receipt of DTSC's comments on the RI <br /> Work Plan, SAP, QAPP and HASP and resolution of any outstanding issues. We anticipate that <br /> two to three weeks will be needed to schedule the driller and complete the USA notification and <br /> utility survey. Field activities are expected to require two to three weeks, and laboratory <br /> analytical results will be available approximately three weeks after the completion of the field <br /> activities. The draft Report on the subsurface characterization activities described herein will be <br /> submitted to DTSC approximately six weeks after the receipt of the laboratory analytical results. <br /> Remedial Investigation Work Plan Page 14 <br /> Former Tracy Railyard, Tracy, California <br /> g:tis-gwupladminWb10510565777.03_upnW9-feportslwork plan4i final\kaAda <br />