My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
50
>
2900 - Site Mitigation Program
>
PR0523379
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 3:12:26 PM
Creation date
4/27/2020 2:43:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523379
PE
2959
FACILITY_ID
FA0015797
FACILITY_NAME
UNION PACIFIC RAILROAD - BOW TIE
STREET_NUMBER
50
Direction
W
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23515007
CURRENT_STATUS
01
SITE_LOCATION
50 W SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 4 <br /> Mike Infurna [EH] <br /> From: Phillips, Hollis [Hollis.Phillips@arcadis-us.com] <br /> Sent: Wednesday, July 16, 2008 10:01 AM <br /> To: Mike Infurna [EH] <br /> Subject: RE: UPRR Tracy WP -APPROVAL by DTSC <br /> Bentonite it is — <br /> Hopefully we'll be in enough GW so we don't have to leave them. <br /> Hollis E. Phillips, PG <br /> Sr. Geologist <br /> ARCADIS-US, Inc. <br /> 155 Montgomery St., Ste. 1500 <br /> San Francisco, CA 94104 <br /> 415.374.2744 X13 <br /> 510.219.7764 (cell) <br /> 415.374.2745 (fax) <br /> hollis.phillips@arcadis-us.com <br /> APlease consider the environment before printing this email <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Wednesday, July 16, 2008 9:59 AM <br /> To: Phillips, Hollis <br /> Subject: RE: UPRR Tracy WP - APPROVAL by DTSC <br /> any longer in the ground than the times you are actually working on/with them shall <br /> have an impermeable seal placed from the top of your filter pack to the surface so <br /> that no preferential pathway is provided. <br /> recommend a bentonite seal if you'd rather not use neat cement on the GPWs left <br /> overnight. <br /> From: Phillips, Hollis [ma ilto:Hollis.Phil lips@arcadis-us.com] <br /> Sent: Wednesday, July 16, 2008 9:10 AM <br /> To: Mike Infurna [EH] <br /> Subject: RE: UPRR Tracy WP - APPROVAL by DTSC <br /> We are planning on sampling the GPS the same day as installation (Thursday). If they do not <br /> recharge by the end of the day we'll place (not grouted) Christy boxes over them and return on <br /> Friday (and Saturday, if necessary). The site is surrounded with construction fencing so they will <br /> not be accessible. Let me know if the County will require a different method of well head <br /> protection. <br /> As far as destruction they'll be grouted (free fall) with neat cement grout after the temporary wells <br /> have been destroyed. <br /> 7/16/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.