My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SIXTH
>
50
>
2900 - Site Mitigation Program
>
PR0523379
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 3:12:26 PM
Creation date
4/27/2020 2:43:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523379
PE
2959
FACILITY_ID
FA0015797
FACILITY_NAME
UNION PACIFIC RAILROAD - BOW TIE
STREET_NUMBER
50
Direction
W
STREET_NAME
SIXTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23515007
CURRENT_STATUS
01
SITE_LOCATION
50 W SIXTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 4 <br /> Hollis E. Phillips, PG <br /> Sr. Geologist <br /> ARCADIS-US, Inc. <br /> 155 Montgomery St., Ste. 1500 <br /> San Francisco, CA 94104 <br /> 415.374.2744 X13 <br /> 510.219.7764 (cell) <br /> 415.374.2745 (fax) <br /> hollis.phillips@arcadis-us.com <br /> APlease consider the enviroornent before printing this email <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Wednesday, July 16, 2008 8:51 AM <br /> To: Phillips, Hollis <br /> Subject: RE: UPRR Tracy WP - APPROVAL by DTSC <br /> Hollis, <br /> first, the access looks like it should meet the requirements assuming <br /> recognize the signatures. I've asked your coworker to provide the signature <br /> page showing names of the signees. <br /> second, your plan is to place Geoprobes, "GPWs" first. If elevated <br /> concentrations are detected, you'll place wells. fine. <br /> How long will the GPs/temporary casings be in the ground? We really don't <br /> recognize temporary wells but have been know to ALLOW for extended <br /> sampling of up to two days, assuming proper well head protection measures <br /> are taken and approved by the EHD. <br /> Let me know your times-in-the-ground for the temp wells/GPs and I'll need to <br /> be onsite for the FIRST GP GROUT. I need to know how you plan on <br /> destroying the GPs. <br /> have the person in the field page me �Z09) 982-8771 with 1-HOUR notice of <br /> the first grout. I'll head down there after I return the page. <br /> If MWs are needed, I will need to be onsite for these grouts also. <br /> From: Phillips, Hollis [mailto:Hollis.Phillips@arcadis-us.com] <br /> Sent: Monday, July 14, 2008 9:10 AM <br /> To: Mike Infurna [EH] <br /> Subject: RE: UPRR Tracy WP - APPROVAL by DTSC <br /> Mike: <br /> Perry's email (see bottom) indicates the WP is approved by DTSC (the lead agency). Do <br /> you need a letter? <br /> 7/16/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.