Laserfiche WebLink
Mr. Jim Levy, Manager <br /> November 22, 2006 <br /> Page 2 <br /> geologist (or his/her designee). To assist with the correlation of CPT readings to site <br /> lithology at least two CPT borings must be located near(i.e., within 25 feet) a soil boring <br /> and/or groundwater well which has been sampled at appropriate intervals for lithologic <br /> description and contaminant analysis to the total depth of CPT investigation. <br /> This letter is intended to acknowledge receipt of and approval of the Phase II Workplan <br /> as an addendum to the previously approved RI Workplan. If you have any questions, <br /> please call Mr. Jesus Sotelo at (916) 255-6670. <br /> 4Sinc ely, <br /> Fern do Ama r, P.E., Chief <br /> Sacramento'Responsible Party Unit <br /> cc: Mr. Eric J. Hinzel <br /> Vice President <br /> Kennedy/Jenks Consultants <br /> Engineers & Scientists <br /> 622 Folsom Street <br /> San Francisco, California 94107 <br /> Mr. Jim Curtis, P.E. <br /> Project Manager <br /> Kennedy/Jenks Consultants <br /> Engineers & Scientists <br /> 622 Folsom Street <br /> San Francisco, California 94107 <br /> Mr. Rick Teczon, P.E., Engineer <br /> Kennedy/Jenks Consultants <br /> Engineers & Scientists <br /> 622 Folsom Street <br /> San Francisco, California 94107 <br />