4 <br /> OCR <br /> Ms. Lori Duncan <br /> April 17, 2000 <br /> Page 2 <br /> • A C-57 licensed drilling contractor will remove the monitoring well boxes and, using 8% -inch <br /> or larger hollow-stem augers, overdrill each well boring to its total original depth; i <br /> • The monitoring well filter pack and casing will be removed, and <br /> • The resultant boring will be sealed with neat cement. The cement will be placed through a <br /> tremie pipe from the well bottom to the surface to ensure complete backfilling of the boring. <br /> Water Supply I Well <br /> The water supply well will be video logged to determine its construction-specifications; <br /> • The water supply well will be perforated and pressure grouted to 5 feet below ground <br /> surface; <br /> • The top five feet of the water supply well casing will be exposed by excavation and cut off; <br /> and <br /> • The excavation will be backfilled with Type 1-II cement. a <br /> The wells will be destroyed in accordance with California Water Well Bulletin 74-81 and <br /> supplement 74-90 guidelines. .The fieldwork will be completed under the oversight of a <br /> geologist registered in the state of California. <br /> Report Preparation <br /> ENSR will submit State of California form '188 Well Completion Reports to the EHD and the <br /> Department of Water Resources-(DWR) upon completion of the well destruction activities. <br /> Project Time Schedule <br /> ENSR estimates that the well destruction will require 1. to 2 days to complete. Permitting and <br /> scheduling will require 1 to 2 weeks, and report preparation will require two weeks to complete. <br /> If you have any questions or comments, please do not hesitate to call either of the undersigned <br /> at (916) 362-7100. <br /> Sincerely, <br /> ENSR j <br /> Larry Braybrooks Alan D. Gibbs, G., C.HG <br /> Project Geologist Environmental Engineering Manager <br /> cc: P. Lopez <br /> .,led N rso-tl s d 1n*S <br /> L;IENSR18728101018728010.WKP.doc <br />