Laserfiche WebLink
S- <br /> t <br /> EALM. <br /> Ms. Pamela Lopez <br /> March 7, 2000 <br /> Page 3 <br /> Description Cost Estimate A Cost Estimate B <br /> 1. Work plan/Permitting ` $1,854 $ 1,951 <br /> 2. Well Abandonment $2,748 $11,152 <br /> 3. Reporting $ 640 $ 905 <br /> 4. Spoils Disposal $ 1,677 $ 1.732 <br /> Totals $6,919 $15,740 <br /> Recommended Budgets: $7,000 $15,800 <br /> ASSUMPTIONS <br /> In addition to those noted in the preceding sections of this proposal, ENSR has made the <br /> following assumptions in preparing the scope of work, schedule, and costs associated with this <br /> project: <br /> • The water supply well depth is 150 feet. <br /> • This proposal is based on the assumption that the site is accessible to the subcontractor's <br /> equipment, which they used in their assumptions to prepare their bid (for example, no <br /> on-site automobiles located in close proximity [< 25 feet] to our proposed test hole). Time <br /> spent for difficulties accessing the site will be charged on a time-and-expense basis and <br /> stand by drilling costs, if appropriate. <br /> • The field program will require one day on site if only the 3 monitoring wells are destroyed. <br /> • The field program will require 2 '/z days if 3 monitoring wells and the water supply well are <br /> destroyed. The half day will be for the video log. <br /> • Fieldwork will be conducted using OSHA Level D, personal protective equipment. <br /> • <br /> Sample analytical costs are based on a standard (10-day) turnaround time. <br /> p Yt <br /> • Utilities will be available on site for all field activities. If not available, additional charges <br /> may be incurred by the client. <br /> • Drill cuttings will be generated. <br /> If you are in agreement with the scope of work, recommended budget, general conditions (Form <br /> 102), and commercial terms, please authorize below and return a copy to us. If additional <br /> investigation efforts or sampling and analysis are recommended based upon our research, a <br /> separate scope of work, schedule, and budget will be submitted for your approval prior to <br /> completion of this study. No additional work will be conducted without your prior written <br /> authorization. <br /> ReCrA Par rlSCV-bas6 Inks <br />{ LAENSR\PR0P0SALS18728A32.doc <br />