My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NOWELL
>
26500
>
3500 - Local Oversight Program
>
PR0545613
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2020 3:39:03 PM
Creation date
4/27/2020 3:33:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545613
PE
3528
FACILITY_ID
FA0005466
FACILITY_NAME
LOPEZ, PAM
STREET_NUMBER
26500
STREET_NAME
NOWELL
STREET_TYPE
RD
City
THORNTON
Zip
95686
CURRENT_STATUS
02
SITE_LOCATION
26500 NOWELL RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ElhCV® <br /> Ms. Pamela Lopez <br /> March 7, 2000 <br /> Page 2 r <br /> Destruction of the water supply well will be accomplished by the following procedures: <br /> • Electrical power to the pump will be shut off and the pump will be disconnected and <br /> removed; <br /> • The top five feet of casing will exposed by excavation and cut off; <br /> • The SJCEHD will require a video log to confirm the well's construction.,specifications <br /> since no records of the well's construction are known; ' <br /> I <br /> • The well casing may need to be perforated prior to pressure grouting. The video log will <br /> be used to determine the need for and the locations of perforations; <br /> • Perforation will be completed by running a cutting tool into the well and making cuts in <br /> I <br /> the casing at specific areas; and I <br /> • The well will be pressure grouted from the bottom to the surface. <br /> Soil cuttings generated during well destruction activities will be containerized in 55-gallon <br /> drums. A composite sample will be collected from the drums for waste characterization. The <br /> cost represented in this work order is for disposal as a non-hazardous waste. <br /> Reporting <br /> ENSR will prepare and submit a report summarizing the results of the well abandonment <br /> activities to the SJCEHD. The report will include field documentation, a revised site map, and <br /> copies of State Department of Water Resources (DWR) Well Completion Reports. Well <br /> Completion Reports will also be submitted to the DWR. <br /> COST SUMMARY <br /> We propose to provide the outlined environmental services on a time and expense basis in <br /> accordance with the. attached cost estimate. The recommended budgets -to complete the <br /> scopes of services (discussed above in the well destruction section) are presented below. The <br /> budget you authorize will not be exceeded without your prior authorization. The scope of work <br /> will be referenced as Task 100. <br /> xyVtg Papc.,US - "ks <br /> LAEN SRIPROPOSALS18728A32,doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.