Laserfiche WebLink
ry <br /> Tri-Valley Growers March ?5, 1987 <br /> Page 6 of 10 Quote No. 6225G <br /> `I <br /> a <br /> E. <br /> 3.0 PROJECT COSTS <br /> Ei <br /> The estimated costs for the project tasks described above in Section 2.0 <br /> are presented below. The actual costs will be billed on a time and <br /> E material basis based on the attached GENERAL PRICE LIST. Technical <br /> performance is contingent on the general conditions provided in Section <br /> 4.0. <br /> E TIMATED COSTS TO BE BILLED ON A TIME AND MATERIAL BASIS. ' <br /> E+ <br /> '.r TASK # DESCRIPTION COST JI <br /> .i <br /> TASK 2.1 Filing for Plans & Permits <br /> (Permit Fees and Inspection costs extra) <br /> F . <br /> E' TASK 2.2 Exploratory Borings <br /> TASK 2.3 Monitoring Well Construction ' <br /> TASK 2.4 Monitoring Well Development <br /> i <br /> TASK 2.5 Groundwater Sampling <br /> k { <br /> TASK 2.6 Surveying <br /> f <br /> s <br /> TASK 2.7 Laboratory Analysis <br /> 6 <br /> TASK 2.8 Site Investigation Report Preparation <br /> i <br /> Er 'I <br /> TASK 2.9 Remedial Action Plan Future proposal <br /> The individual tasks will be billed as they are completed. Exceltech <br /> payment terms are net 30 days, due and payable upon receipt of our <br /> E <br /> invoice. Interest of 1 .5% per month will be assessed on any overdue <br /> balance. ' <br /> �i <br /> !f5 <br /> II <br /> y� <br /> f <br /> e� <br />