Laserfiche WebLink
J <br /> Tri-Valley Growers March 2;, 1987 <br /> r"Page 5 0# 10 Quote No. 6225G <br /> T 1 <br /> !I �: <br /> ! I <br /> M <br /> The samples will be tested on a normal 10 day laboratory unless rush G <br /> charges are requested (rush charge 3 times the normal rate). <br /> ;I <br /> Task 2.8 Sile InygEtigation Report Preparation <br /> Exceltech shall prepare a Site Investigation Report summarizing the field <br /> and laboratory methods used, the data obtained, conclusions and ' <br /> recommendations based on our findings. The report will contain boring logs <br /> for each exploration boring drilled, logs and construction details of each <br /> monitoring well installed, results of all laboratory testing, site maps <br /> showing features relevant to the investigation, maps showing groundwater <br /> contamination and groundwater flow, and cross-sections illustrating the <br /> subsurface geology_ <br /> i <br /> i <br /> f� a <br /> Task 2.9 Remedial Action Plan I <br /> The development of a Remedial Action Plan to meet the requirements of the <br /> Regional Water Quality Control Board (RWQCB) will be dependent on the <br /> fi <br /> findings of the investigations outlined in' sections 2.1 and 2.2 above. A <br /> .w <br /> proposal for this report will be submitted Etat a future date. <br /> 14 <br /> :r <br /> �E 4 <br /> i <br /> ij <br /> f5 i <br /> } <br /> it <br /> Ek <br /> `I <br /> k <br /> Ir <br />