Laserfiche WebLink
Universal Forest Products page 2 <br /> 26200 Nowell Rd, Thornton. <br /> Work plan comment letter <br /> COMMENTS AND CONDITIONS (continued): <br /> • Soil and ground water grab samples collected at the UST removal <br /> were not analyzed for lead scavenger 1,2 Dichloroethane (1,2-DCA) <br /> or Ethylene dibromide (EDB). Future evaluations for `closure' will <br /> require data for these constituents. SJCEHD will require the `in-pit' <br /> soil boring to have selected soil and the ground water sample'be <br /> additionally analyzed for 1,2-DCA and EDB by 8260B. Unless future <br /> investigations are planned to gather this data, selected soil and the <br /> ground water samples from the other proposed borings should also <br /> have samples analyzed for 1,2-DCA and EDB during this-phase. <br /> REASONS FOR DISAPPROVAL OF THE WORKPLAN [H&S Section <br /> 25296.1 0 c 3 : <br /> • none. <br /> DATED: January 11, 2005 BY C�1 ' <br /> Michael Infurna EHS. (209) 468-3454 <br /> c: CVRWQCB — James L. Barton, Sacramento. <br /> c: SWRCB — CUF — Mark Owens, Sacramento. <br /> G' ICES — Peng Leong, PO Box 99288, Emeryville. 94662-9288 <br /> [X] faxed to consultant on: January 11,_2005 <br />