n1 <br /> 20 January 2000 <br /> • AGE-NC Project No 95-0173 <br /> Page 13 of 14 <br /> to surface grade A proposed IAS infection well diagram is included as Figures 6 <br /> 4 3 2 In-situ Air Sparging Piping System <br /> An electric air compressor will operate independently from the SVE unit This will allow for control <br /> of air flow to each IAS well and "surging" of the IAS system, if necessary, to prevent mounding <br /> and/or migration of the dissolved hydrocarbons A separate electrical source and meter will be <br /> necessary for the IAS system <br /> A network of one-inch diameter, schedule 40 PVC piping will be installed in 6-inch wide by 12-inch <br /> deep trenches at the site The PVC piping will be routed from each IAS well head to an air <br /> compressor A PVC ball valve will be installed at each IAS well head so that air flow can be <br /> depressed independently A plan of the proposed air spargmg piping system is depicted in Figure 5 <br /> The location of the air compressor is proposed near the southwest corner at the site (Figure 3) The <br /> air compressor will be secured by a chain-linked, gated enclosure with measurements 15 feet wide <br /> by 20 feet long and six feet in height <br /> 4 3 3 In-situ Air Sparging Monitoring Activities <br /> Quarterly ground water monitoring and sampling is proposed throughout the remediation period <br /> However, we recommend monthly measurements of ground water depth and dissolved oxygen from <br /> ground water monitoring wells at the site to determine if ground water mounding is occurring as a <br /> result of the IAS system operation <br /> 44 PERMITTING <br /> An application for a site specific permit will be submitted to the San Joaquin Valley Air Pollution <br /> Control District (SJVAPCD) prior to initiation of the remediation project In addition, proper <br /> building permits will be obtained from the City of Ripon Building Department for necessary <br /> construction work, including natural gas and electrical source installations <br /> All necessary welliboring permits will be submitted to the PHS-EHD prior to any drilling activities <br /> A minimum of 48 hours notice will be given to the PHS-EHD prior to performing any field work <br /> Advanced GeoEnvironmental,Inc <br />