' Site Background Information: Ripon Farm Service <br /> • - Page'6 of 7 . <br /> VW-9B, VW-10 and VW-II were completed as vapor extraction wells, drilled to a total depth of <br /> approximately 18 feet bsg and completed with a 5-f6ot screen interval. <br /> Sol] samples were collected from air-sparge pilot borings IAS1 to IAS4 ahead of the drill bit using <br /> a core barrel. TPH-g was detected in each of the samples at concentrations as high as 990 mg/kg. <br /> TPH-d was also detected in each sample analyzed at concentrations as high as 1,000 mg/kg. BTEX <br /> compounds were detected in each sample analyzed.Benzene was detected at concentrations as high <br /> ' as 0.63 mg/kg at a depth of 18 feet bsg. The only fuel additive detected was 1,2 DCA ata maximum <br /> concentration of 20 micrograms per kilogram (pg/kg). <br /> ' A Solleco catalytic-oxidation soil vapor extraction (SVE) unit began operation at the site in <br /> December 2000. The system was monitored monthly during operation and after re-start events. <br /> During. each monitoring event, the SVE flow rate, vacuum (potential) and concentrations of <br /> ' hydrocarbons in the extracted soil-vapor were measured and a set of soil-vapor samples were <br /> collected by AGE personnel. The unit operated at an average extraction flow rate of 85 and 90 <br /> standard cubic feet per minute(cfm). A compressor-based EnviroSparge IAS system was installed <br /> ' at the site in August 2001. The IAS system delivered 6 cfm at a pressure of 10 pounds per square <br /> inch,adequate to displace the static water within each sparge well.In addition,the dissolved oxygen <br /> in the ground Water wells was measured to monitor the efficiency of the IAS system. <br /> Elevated concentrations of dissolved oxygen were periodically detected in monitoring wells used as <br /> observation wells within and outside the IAS network on the site. The highest dissolved oxygen <br /> ' value measured in well MW-1 was at 12.1 %and in well MW-2 was at 20.8%..Generally,dissolved <br /> oxygen concentrations measured in the wells remained stable at,or sporadically increased above pre- <br /> remedial levels. Sparging rates were measured at approximately 6 scfm during each monitoring <br /> event. A pressure of approximately 10 psi was maintained for the air sparging flow rate. <br /> ' The estimated mass of hydrocarbons removed was based on laboratory analysis of soil-vapor <br /> samples. The mass of extracted hydrocarbons was calculated for each time period using average <br /> hydrocarbon concentrations of influent soil-vapor sample data and average air flow rates.A total of <br /> 2,122.45 kg (4,229.12 lbs), or a volume of 748.5 gallons hydrocarbons as gasoline was removed <br /> between December 2000 and December 2003. <br /> ' During this period,the petroleum-hydrocarbon concentrations declined to the point where utilizing <br /> the unit was no longer cost effective in terms of the remediation goals.The catalytic SVE system was <br /> replaced on 13 December 2002 With a vacuum blower and 55-gallon moisture collection canister. <br /> ' Operation of a soil vapor extraction (SVE) vacuum blower ceased in January 2004 due to <br /> malfunction of the equipment.A sample of the soil vapor from the monitoring events during the last <br /> quarter of 2003 was absent of detectable hydrocarbons, therefore SVE was not restarted. <br /> ' Advanced GeoEnvironmental,Inc. <br />