Laserfiche WebLink
J EJ .f& — T U E 13 4 I C. E R R 'i' FSI I H H I S &VIII T I ha C: P 1 i� <br /> 5 <br /> I . n first aid kit - will be on hand in all vehicles and a map <br /> showing " the nearest hospital will be provided to all <br /> workers. <br /> J . Decontaminat--i-on will consist of disassembling the drilling <br /> tools and steam cleaning of all tool parts. This will be <br /> completed after drilling of each new boring . 'Decontamination <br /> of sample collection devices will be done after each sample <br /> is collected ; <br /> K . Tam Hunt will be, on site safety officer . ( 40 hour- OSHA <br /> trained , Cal OSHA supervising certificate, Contracting <br /> Engineer and C-57 licensed ) . <br /> f? <br /> Respectfully, <br /> Tim K. Smith ; <br /> Reg . Cal . Geologist 414013 <br /> Reg . Environmental Assessor #291 <br /> AMENDED (2nd ) JUNE b, 1992 <br /> � t <br /> I <br /> 1 1 <br /> k <br /> { <br /> i� <br /> 4 <br /> i <br />