Laserfiche WebLink
Mr Ronald Rowe <br /> March 4, 1998 <br /> Page 5 <br /> development, and sampling of all wells The starting date will depend on County approval of <br /> the work plan, well pennits, and on driller availability <br /> A summary report in letter form will be completed within six weeks after the field work is <br /> complete The report will include a description of field methods, results of laboratory <br /> analysis of soil (if any) and groundwater samples, and conclusions The report will be <br /> submitted to T&T Trucking for review, and the final report will be provided to the County <br /> and the RWQCB <br /> If you have questions or comments, please call me at (916) 444-0123 <br /> Sincerely, <br /> BROWN AND CALDWELL <br /> Tina M Bauer <br /> Project Manager <br /> • cc Mr Terry Tarditi, T&T Trucking <br /> Use or disclosure of data continued on this sheet is subject to the restriction specified at the beginning of this <br /> document <br /> �fELNGEN162711WRKPLN DOC <br />