My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005687
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11396
>
3500 - Local Oversight Program
>
PR0545624
>
ARCHIVED REPORTS_XR0005687
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:31 PM
Creation date
4/29/2020 1:05:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005687
RECORD_ID
PR0545624
PE
3528
FACILITY_ID
FA0003786
FACILITY_NAME
T&T TRUCKING INC
STREET_NUMBER
11396
Direction
N
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05926010
CURRENT_STATUS
02
SITE_LOCATION
11396 N HWY 99 RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:a <br /> Mr Ronald Rowe <br /> January 22, 1998 <br /> Page 2 <br /> Scope of Work <br /> Field work includes <br /> • Pulled the pump from the "unused" domestic well on January 14, 1998 This was <br /> done by T&T Trucking <br /> • Allow the water level and turbidity of the "unused" domestic well to rest a few days <br /> • Install one transducer into MW-1 and the "unused" domestic well Each transducer <br /> will be connected to a datalogger Each datalogger will be calibrated to the same time <br /> and started at the same time Water levels in MW-1 and the "unused" domestic well <br /> will be recorded prior to starting the dataloggers The dataloggers will be set to record <br /> the head of water (above the transducer pressure sensor) every 15 minutes for <br /> approximately 7 days <br /> • Each transducer will be secured to prevent slippage of the cable In addition, the <br /> dataloggers will be protected from tampering and weather <br /> • After 7 days, the test will be stopped All equipment will be cleaned and properly <br /> deconned before removal from the site <br /> SSummary Letter <br /> A summary of the results and interpretation of this limited hydrologic study will be submitted <br /> to you in letter format, approximately two (2) weeks after the completion of the on-site test <br /> If you have any questions, please call me at (916) 444-0123 <br /> Sincerely, <br /> BROWN AND CALDWELL <br /> A <br /> Tina Bauer <br /> Project Manager <br /> E 162711CORRESPILTR-] DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.