:a <br /> Mr Ronald Rowe <br /> January 22, 1998 <br /> Page 2 <br /> Scope of Work <br /> Field work includes <br /> • Pulled the pump from the "unused" domestic well on January 14, 1998 This was <br /> done by T&T Trucking <br /> • Allow the water level and turbidity of the "unused" domestic well to rest a few days <br /> • Install one transducer into MW-1 and the "unused" domestic well Each transducer <br /> will be connected to a datalogger Each datalogger will be calibrated to the same time <br /> and started at the same time Water levels in MW-1 and the "unused" domestic well <br /> will be recorded prior to starting the dataloggers The dataloggers will be set to record <br /> the head of water (above the transducer pressure sensor) every 15 minutes for <br /> approximately 7 days <br /> • Each transducer will be secured to prevent slippage of the cable In addition, the <br /> dataloggers will be protected from tampering and weather <br /> • After 7 days, the test will be stopped All equipment will be cleaned and properly <br /> deconned before removal from the site <br /> SSummary Letter <br /> A summary of the results and interpretation of this limited hydrologic study will be submitted <br /> to you in letter format, approximately two (2) weeks after the completion of the on-site test <br /> If you have any questions, please call me at (916) 444-0123 <br /> Sincerely, <br /> BROWN AND CALDWELL <br /> A <br /> Tina Bauer <br /> Project Manager <br /> E 162711CORRESPILTR-] DOC <br />