Laserfiche WebLink
- P <br /> „ PRELIMINARY HYDROGEOLOGIST ASSESSMENT REPORT <br /> 148M'Nest Frontage Road <br /> Manteca,California <br /> Delta Project No.4OM-479 <br /> Page 9 <br /> TABLE 5 <br /> Monitoring Well Water Levels <br /> Depth to Water Casing Elevation Water Table Elevation <br /> Well Date (feet below surface) feet above sea level) feet above sea level) <br /> MW-1 05-11-89 29.38 96.24 66`'.6 <br /> 05-23-89 28.36 96.24 67.88 -- <br /> 1 06-07-89 29.27 96.24 66.97 <br /> 06-27-89 29.56 96.24 66.68 <br /> MW-2 05-11-89 29.18 97.20 68.02 <br /> 05-23-89 29.27 97.20 67.93 <br /> 06-07-89 29.11 97.20 68.09 <br /> W 06-27-89 30.54 97.20 66.65 <br /> t. MW-3 05-11-89 29.79 97.84 68.05 <br /> 05-23-89 29.84 97.84 68.00 ✓ <br /> 06-07-89 29.84 97.84 68.00 <br /> 06-27-89 31.19 97.84 66.65 <br /> MW-4 05-11-89 28.43 97.20 68.77 <br /> 05-23-89 29.11 97.20 68.09 <br /> 06-07-89 28.36 97.20 68.84 . <br /> 06-27-89 30.64 97.20 66.56 <br /> F. f. <br /> TABLE b <br /> Results of Slug Tests <br /> j <br /> Monitoring Well K = Hydraulic Conductivity <br /> f <br /> ' MW-1 8.16 feet/day <br /> mw-2 6.16 feet/day <br /> -- 8.69 feet/day- <br /> MW-4 <br /> eet/day MW-4 2.14 feet/day <br /> ab <br /> MR m MEN, <br />