ABBREVIATIONS ELECTRICAL SYMBOL LEGEND SECURITY SYSTEM NOTES TELEPHONE SYSTEM NOTES GENERAL ELECTRICAL NOTES ..
<br /> AFF ABOVE FINISHED FLOOR 0JUNCTON BOX RECEPTACLE: DUPLEX STARBUCKS CONTRACTS DIRECTLY WITH SECURITY VENDOR TO SUPPLY IF ADDITIONAL TELEPHONE LINES ARE REQUIRED BEYOND THE 1. THE ELECTRICAL CONTRACTOR SHALL COORDINATE ELECTRICAL
<br /> AHJ AUTHORITIES HAVING JURISDICTION J AND INSTALL THE SECURITY SYSTEM. CONTRACTOR TO SCHEDULE STANDARD SINGLE LINE (SUCH AS FOR A FIRE ALARM)THE GENERAL WORK AND SPECIFICATIONS WITH OTHER TRADES. THE
<br /> APPROX APPROXIMATE INSTALLATION OF SECURITY SYSTEM FOR FOUR (4)TIMES; CONTRACTOR SHALL CONTACT STARBUCKS PRIOR TO BEGINNING ARCHITECTURAL DRAWINGS AND SPECIFICATIONS SHALL TAKE
<br /> 1. MEET TO PLAN SECURITY CABLE PULL WITH SECURITY CABLE CONSTRUCTION TO ORDER THE ADDITIONAL TELEPHONE LINE(S). PRECEDENCE OVER ALL OTHER DRAWINGS. DO NOT SCALE
<br /> BLDG BUILDING $ SWITCH RECEPTACLE-. DUPLEX- INSTALLER PRIOR TO DRYWALL INSTALLATION. REPORT ANY TELEPHONE INSTALLATION ISSUES IMMEDIATELY TO DISTANCES OFF THE ELECTRICAL DRAWINGS; USE ACTUAL
<br /> n INDIVIDUAL BRANCH CIRCUIT 2. SECURITY CABLE INSTALLER PULLS SECURITY CABLES, MOUNTS STARBUCKS. BUILDING DIMENSIONS. OVERALL CASEWORK COMPONENT
<br /> CKT CIRCUIT PANEL, KEYPAD AND SENSORS. DIMENSIONING ON ELECTRICAL DETAILS ARE SHOWN FOR
<br /> CLG CEILING $3 THREE-WAY SWITCH RECEPTACLE: QUAD 3. SECURITY EQUIPMENT INSTALL OF CAMERA, NVR AND MONITOR. CONFIRM PRIOR TO BEGINNING CONSTRUCTION THAT THERE ARE REFERENCE AND COORDINATION ONLY. SEE SPECIFICATION
<br /> CM STARBUCKS CONSTRUCTION MANAGER 4. SECURITY MONITORING COMPANY TO BRING SYSTEM ONLINE AND EXISTING, WORKING TELCO FACILITIES TO THE BUILDING OR THAT SHEETS FOR ELECTRICAL SPECIFICATIONS
<br /> CONST CONSTRUCTION TRAIN PARTNERS AFTER POS INSTALL. LANDLORD HAS FURNISHED AND INSTALLED ONE (1)2" (51MM) MIN. 02011 STARBUCKS COFFEE COMPANY
<br /> CW COLD WATER MOTION (OCCUPANCY) RECEPTACLE- QUAD - (ENTRANCE) CONDUIT INCLUDING PULL STRING FROM TELCO STREET 2. ALL ELECTRICAL SYSTEMS SHALL BE TESTED FOR PROPER
<br /> CXA COMMISSIONING AGENT M SENSOR SWITCH INDIVIDUAL BRANCH CIRCUIT SECURITY VENDOR REQUIRES A MINIMUM TWO (2)WEEKS LEAD TIME FOR FEED LINE TO THE BUILDING AS IDENTIFIED BY THE PHONE COMPANY. OPERATION. BALANCE ALL BRANCH CIRCUIT LOADS BETWEEN
<br /> EACH INSTALLATION. SECURITY VENDOR WILL COORDINATE REGIONAL NOTIFY STARBUCKS CONSTRUCTION MANAGER IMMEDIATELY IF THE PHASES OF THE SYSTEM WITHIN 10% OF THE HIGHEST PHASE STARBUCKS COFFEE
<br /> DEG DEGREES SWITCHBACK RECEPTACLE: HIGH VOLTAGE INSTALLERS. ALL ADDITIONAL EXPENSES INCURRED DUE TO THE FACILITIES OR CONDUIT AND PULL STRING ARE NOT INSTALLED. LOAD IN EACH PANEL BOARD. COMPANY
<br /> DL LIGHTS WITHIN DAYLIGHT ZONE mm CONTRACTOR'S FAILURE TO SCHEDULE ACCORDINGLY WILL BE THE
<br /> DM STARBUCKS DESIGN MANAGER RESPONSIBILITY OF THE CONTRACTOR. GENERAL CONTRACTOR IS TO ENSURE THAT THERE IS A 2" (51 MM) MIN. 3. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR DE- 2401 UTAH AVENUE SOUTH
<br /> DN DOWN CONDUIT WITH PULL STRING FROM THE DATA RACK TO THE DEMARC ENERGIZING CIRCUITS IN DEMOLITION AREAS TO INSURE A SAFE SEATTLE, WASHINGTON 98134
<br /> DTL DETAIL - TELEPHONE ® RECEPTACLE: FLOOR DUPLEX (TELCO TO CUSTOMER HAND OFF EQUIPMENT)WHEN THE DEMARC IS CONDITION. ELECTRICAL DEVICES AND ASSOCIATED WIRING
<br /> DWG(S) DRAWING(S) MORE THAN 10' FROM THE DATA RACK. DISTANCES LESS THAN 10'WILL LOCATED WITHIN THE DEMOLITION AREA THAT WILL NO LONGER (206) 318-1575
<br /> CARBON MONOXIDE NOT REQUIRE CONDUIT. BE USED SHALL BE REMOVED AND PROPERLY DISPOSED OF AT
<br /> EA EACH OT THERMOSTAT �_ GROUNDING ELECTRODE CONTRACTORS EXPENSE UNLESS OTHERWISE NOTED. THESE DRAWINGS AND SPECIFICATIONS ARE
<br /> EC ELECTRICAL CONTRACTOR CONNECTION (CO) DETECTOR NOTES PROVIDE A 3-POSITION GROUND LUG, GROUNDED WITH#6 AWG CONFIDENTIAL AND SHALL REMAIN THE SOLE
<br /> ECP EQUIPMENT CONTROL PAC GROUND WIRE, IF REQUIRED BY TELEPHONE COMPANY. 4. THE ELECTRICAL CONTRACTOR SHALL SCHEDULE ALL ELECTRICAL PROPERTY OF STARBUCKS CORPORATION,
<br /> EG EXHAUST GRILLE SYSTEM OUTAGES WITH THE GENERAL CONTRACTOR AND WHICH IS THE OWNER OF THE COPYRIGHT IN THIS
<br /> ELEC ELECTRICAL SO THERMOSTAT SENSOR NL NIGHTLIGHTING 24HR/DAY COORDINATE INSTALLATION OF CARBON MONOXIDE (CO) LANDLORD AT LEAST 24 HOURS IN ADVANCE. UNLESS APPROVED DETECTOR ALL TELEPHONE/NETWORK CABLING IS THE SCOPE OF WORK OF THE WORK. THEY SHALL NOT A REPRODUCED(IN
<br /> WHOLE OR IN PART), SHARED WITH THIRD
<br /> EM EMERGENCY DEVICE(S)AND LOW VOLTAGE WIRING WITH STARBUCKS SECURITY TELEPHONE/NETWORK CABLING VENDOR. OTHERWISE ALL OUTAGES SHALL OCCUR BETWEEN 11:00PM AND PARTIES OR USED IN ANY MANNER ON OTHER
<br /> EMS ENERGY MANAGEMENT SYSTEM VENDOR FOR NEW STORES, RELOCATIONS AND MAJOR RENOVATIONS, IF 5:00AM. PROJECTS OR EXTENSIONS TO THIS PROJECT
<br /> EXIST EXISTING [ DIMMER SWITCH PE PHOTOELECTRIC CELL IN VENDOR SCOPE. VENDOR TO PROVIDE AND INSTALL DEVICE(S) IN BOH WITHOUT THE PRIOR WRITTEN CONSENT OF
<br /> EXT EXTERIOR AND FOH (AS APPLICABLE PER STARBUCKS STANDARDS). 5. ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL STARBUCKS CORPORATION. THESE DRAWINGS
<br /> NECESSARY CONDUIT AND J-BOXES TO SUPPORT A COMPLETE AND SPECIFICATIONS ARE INTENDED TO EXPRESS
<br /> F&I FURNISH & INSTALL ® RECEPTACLE-. DATA SPEAKER POS \ DATA LINE NOTES SECURITY, PHONE, POS AND DATA SYSTEMS. SEE MANAGER DESIGN INTENT FOR A PROTOTYPICAL
<br /> FLR FLOOR WORKSTATION AND BAR POINT OF SALE (POS) STARBUCKS STORE(WHICH IS SUBJECT TO
<br /> FT FOOT/FEET FIRE ALARM SYSTEM NOTES POWER/TELECOM/SECURITY DIAGRAM. COORDINATE ALL DEVICE CHANGE AT ANYTIME)AND DO NOT REFLECT
<br /> STARBUCKS CONTRACTS DIRECTLY WITH THE DATA CABLING VENDOR ACTUAL SITE CONDITIONS. NEITHER PARTY SHALL
<br /> LOCATIONS AND MOUNTING HEIGHTS WITH SECURITY VENDOR
<br /> RACEWAY CONCEALED w WIFI ACCESS POINT HAVE ANY OBLIGATION NOR LIABILITY TO THE
<br /> GC GENERAL CONTRACTOR � TO SUPPLY AND INSTALL CATEGORY 5e (CAT5e) LAN CABLE AND PRIOR TO ROUGH-IN. PROVIDE END-TO-END PULL STRINGS IN ALL OTHER EXCEPT STATED ABOVE) UNTIL A
<br /> GFCI GROUND FAULT CIRCUIT INTERRUPTER IN CEILING S I WALL. IF STARBUCKS IS REQUIRED TO PROVIDE A FIRE ALARM AND/OR FIRE CONNECTORS FOR THE POINT OF SALE POS SYSTEMS. CONTRACTOR
<br /> HASH MARKS INDICATE (POS) CONDUITS. LABEL EACH END OF THE PULL STRING WITH CONDUIT WRITTEN AGREEMENT IS FULLY EXECUTED BY
<br /> GND GROUND ALARM MONITORING AND/OR PHONE LINES FOR A FIRE ALARM, AS TO SCHEDULE INSTALLATION OF DATA CABLING WITH DATA CABLING SYSTEM ("SECURITY")AND DESTINATION ("CAFE", "FRONT BAR", BOTH PARTIES.
<br /> NUMBER OF WIRES. SPECIFIED IN THE LEASE AGREEMENT, THE CONTRACTOR IS TO NOTIFY VENDOR. DATA CABLING VENDOR REQUIRES A LEAD TIME FOR ETC.). PROVIDE INSULATED BUSHINGS ON ALL STUBBED-UP AND
<br /> HR HOUR #12 AWG WIRE UNLESS GNOC IMMEDIATELY THAT FIRE ALARM LINES ARE NEEDED. STARBUCKS INSTALLATION. DATA CABLING VENDOR WILL COORDINATE REGIONAL EXPOSED CONDUIT ENDS.
<br /> HVAC HEATING, VENTILATION, AIR CONDITIONING OTHERWISE NOTED. PREFERRED FIRE ALARM SERVICE PROVIDER, STANLEY, IS TO BE INSTALLERS. ARCHITECT OF RECORD
<br /> HW HOT WATER TWO WIRES PLUS CONTACTED BY THE CONSTRUCTION MANAGER TO INSTALL FIRE ALARM °'
<br /> 6. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE � °'
<br /> GROUND IF NO HASH PANEL AND/OR MONITORING SERVICE AS REQUIRED. AT THE START OF CONSTRUCTION, STARBUCKS CONSTRUCTION i •
<br /> GENERAL CONTRACTOR TO PATCH AND REPAIR ALL EXISTING
<br /> LCP LIGHTING CONTROL PANEL MARKS SHOWN. LONG MANAGER SCHEDULES DELIVERY OF CASH REGISTER/MANAGER'S WALLS, FLOORS, CEILINGS OR OTHER SURFACES IDENTIFIED TO
<br /> U
<br /> LL LANDLORD HASH MARK DENOTES WORKSTATION EQUIPMENT AND INSTALLATION BY A POS INSTALL REMAIN THAT MAY BECOME DAMAGED DURING THE COURSE OF
<br /> LS LIGHT SENSOR PHOTOCELL NEUTRAL. TECHNICIAN FOR ONE (1) MONTH PRIOR TO STORE OPEN. WORK. N
<br /> ENERGY MANAGEMENT SYSTEM (EMS)
<br /> LV LOW VOLTAGE GROUND WIRE NOT CONTRACTOR TO VERIFY DELIVERY SCHEDULE TWO (2)WEEKS PRIOR
<br /> SHOWN. TO DELIVERY AND INSTALLATION DATE. EQUIPMENT IS SHIPPED 7. EXPOSED/SURFACE MOUNTED CONDUITS SHALL ONLY BE
<br /> mcg a r c h i t e c u r e
<br /> MAX MAXIMUM DIRECTLY TO THE STORE. CONTRACTOR TO ACCEPT POS EQUIPMENT ALLOWED WHERE NECESSARY IN EXPOSED CEILING AREAS. IF
<br /> MC MECHANICAL CONTRACTOR THE GENERAL CONTRACTOR SHALL CONTACT AND COORDINATE DELIVERY. DO NOT REFUSE DELIVERY. CONDUITS NEED TO BE SURFACE MOUNTED TO WALLS, 111 Pacifica, Suite 280, Irvine,CA 92618
<br /> MDP MAIN DISTRIBUTION PANEL INSTALLATION OF<INSERT LCP PRODUCT>AND<INSERT EMS SYSTEM> COORDINATE WITH STARBUCKS CONSTRUCTION MANAGER FOR P: 949.553.1117 F:949.474.7056
<br /> MECH MECHANICAL WITH EMS INSTALLER. PRIOR TO LAST WEEK OF CONSTRUCTION. DATA CABLING TECHNICIAN TO PROVIDE ALL CAT5e LAN CABLING AND APPROVAL.
<br /> MEP MECHANICAL, ELECTRICAL, AND PLUMBING FURNISH AND INSTALL TEMPORARY THERMOSTATS AND SENSORS, AND CONNECTORS FROM ALL DESIGNED AND FUTURE CASH REGISTER
<br /> ROUTE ALL LOW VOLTAGE WIRING THROUGH EC PROVIDED CONDUITS
<br /> MFG MANUFACTURER LOCATIONS, MANAGER'S WORKSTATION, ALL OTHER NETWORKED 8. VERIFY LOCATION OF ALL OUTLETS AND SWITCHES WITH �titititititititi
<br /> (COORDINATE WITH ELECTRICAL). tititi
<br /> MIN MINIMUM EQUIPMENT (CUP LABELERS, CLOVER, BUMP BAR, ETC...)AND ARCHITECTURAL DRAWINGS, INTERIOR DETAILS, FINISH r�^rQROFESS,pv Zits
<br /> WIRELESS ACCESS POINT TO THE DATA RACK AREA. CONTRACTOR IS SCHEDULES, GENERAL CONTRACTOR, EQUIPMENT VENDORS, ACTESYrrR��`SLAv Z.C��Ft22
<br /> NL NIGHTLIGHT FURNISH AND INSTALL RACEWAYS WITH PULL STRINGS AND TO HAVE CONDUIT WITH PULL STRING IN PLACE FOR ALL CABLE RUNS STARBUCKS AND EXISTING SITE CONDITIONS. VERIFY FINAL DOOR ENGINEERING
<br /> NTS NOT TO SCALE JUNCTION BOXES FOR THERMOSTAT(S)AND SENSOR(S). PRIOR TO CABLE INSTALL DATE. HINGE LOCATION PRIOR TO SWITCH INSTALLATION AND ADJUST 3371 Olcott Street
<br /> SWITCH LOCATION IF NEEDED. DO NOT MOUNT Santa Clara,CA 95054 l 15130 A 1
<br /> OCP OVERCURRENT PROTECTION SET RESTROOM OCCUPANCY SENSOR TO 15 MINUTE 'ON' DURATION STARBUCKS NEW STORE GROUP IS RESPONSIBLE FOR COORDINATING RECEPTACLES/SWITCHES IN LOCATIONS THAT WOULD CONFLICT ph:(408)522-5255 2 xp.0¢/30/20 4L r
<br /> IN SINGLE OCCUPANT RESTROOM AND TO 20 MINUTE 'ON' DURATION STARBUCKS POS SYSTEMS DELIVERY AND INSTALLATION WITH THE POSt r
<br /> WITH MIRRORS, SEAMS OF WALLS, WAINSCOTS, TILE fx: 408 522-5260
<br /> REF REFERENCE IN MULTI-OCCUPANT RESTROOM UNLESS JURISDICTION VENDOR. THIS GROUP MAY BE CONTACTED AT: TRANSITIONS, ETC... info acies.nettiZfj9 ZFCTR�GP ��Pr
<br /> REQ('D) REQUIRE(D) REQUIREMENTS STATE OTHERWISE. NEWSTORES@STARBUCKS.COM . Copyrght©2019 111ti1C,tiCA1vF���r
<br /> REV REVISION
<br /> COORDINATE WITH DRAWINGS AND LCP VENDOR FOR DEVICE
<br /> SF SQUARE FEET LOCATIONS. VENDOR SHALL COMMISSION CONTROLS.
<br /> SPT SHEET COMMUNICATION SYSTEM NOTES GENERAL NOTES
<br /> SPECS SPECIFICATION(S) THE GENERAL CONTRACTOR IS TO COMPLETE FINAL CONNECTION
<br /> SST STAINLESS STEEL AFTER DATA RACK AND NETWORK INSTALLATION. THE GENERAL
<br /> CONTRACTOR IS TO CONTACT LCP VENDOR TO VERIFY SYSTEM CONFIRM PRIOR TO BEGINNING CONSTRUCTION THAT THE LANDLORD HAS SCOPE
<br /> TEL TELEPHONE OPERATION AND TROUBLESHOOT IF REQUIRED. FURNISHED AND INSTALLED ONE (1)ADDITIONAL 2" (51 MM) (ENTRANCE) THE INTENT OF THE SPECIFICATION AND THE DRAWINGS IS TO PROVIDE
<br /> TEMP TEMPORARY CONDUIT INCLUDING PULL STRING (FOR A TOTAL OF TWO (2)) FROM THE A COMPLETE AND FULLY OPERATIONAL ELECTRICAL SYSTEM. THE
<br /> TYP TYPICAL STREET FEED TO THE BUILDING AS IDENTIFIED BY THE INTERNET SERVICE ELECTRICAL CONTRACTOR SHALL FURNISH AND INSTALL ALL LABOR,
<br /> PROVIDER. MATERIAL, AND EQUIPMENT NECESSARY TO COMPLETE THE
<br /> UNO UNLESS NOTED OTHERWISE CONTROLS AND OPERATION ELECTRICAL WORK.
<br /> WH WATER HEATER SITE EXAMINATION
<br /> WP WEATHER PROOF THE GENERAL CONTRACTOR SHALL CONTACT AND COORDINATE THE ELECTRICAL CONTRACTOR SHALL THOROUGHLY EXAMINE ALL
<br /> INSTALLATION OF LIGHTING CONTROL PANEL WITH "LUTRON" PRIOR WIRELESS NETWORK NOTES
<br /> AREAS WHERE EQUIPMENT, CONDUIT, AND WIRING WILL BE INSTALLED
<br /> TO THE LAST WEEK OF CONSTRUCTION. AND WILL REPORT ANY CONDITION THAT, IN HIS OPINION, PREVENTS W W m
<br /> THE PROPER INSTALLATION OF THE ELECTRICAL WORK.
<br /> CABLING FOR INTERNET SERVICE SHALL BE FURNISHED AND INSTALLED
<br /> FURNISH AND INSTALL RACEWAYS WITH PULL STRINGS AND JUNCTION 3: Z Q
<br /> BOXES FOR THERMOSTAT(S)AND SENSOR(S). BY THE VENDOR FOR FIBER OR BROADBAND CONNECTIONS. T1 AND STANDARDS &j Q U
<br /> ETHERNET EXTENSION CABLING IS PROVIDED BY THE STARBUCKS Ax J
<br /> SET RESTROOM OCCUPANCY SENSOR TO 15 MINUTE 'ON' DURATION IN (TELEPHONE/ NETWORK) CABLING VENDOR. COORDINATE WITH EQUIPMENT AND MATERIALS SHALL CONFORM WITH APPROPRIATE W LLLI
<br /> SINGLE OCCUPANT RESTROOM AND TO 20 MINUTE 'ON' DURATION IN STARBUCKS. PROVISIONS OF CSA, ULC, NEC, ASTM, O ETL, NEMA, ANSI, AS �jj 0 z
<br /> APPLICABLE TO EACH INDIVIDUAL UNIT OR ASSEMBLY.
<br /> MULTI-OCCUPANT RESTROOM UNLESS JURISDICTION REQUIREMENTS Q = 0 O
<br /> STATE OTHERWISE. CODES z U Q w
<br /> COORDINATE WITH DRAWINGS AND LCP VENDOR FOR DEVICE ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL W W 3 U
<br /> LOCATIONS. VENDOR SHALL COMMISSION CONTROLS. APPLICABLE PROVINCIAL AND LOCAL CODES AND ORDINANCES. IN CASE O O
<br /> MMUSIC SYSTEM NOTES OF CONFLICT BETWEEN THE DRAWINGS AND SPECIFICATIONS AND THE 3
<br /> CODES, THE HIGHEST STANDARD SHALL APPLY. ELECTRICAL O Q O
<br /> THE GENERAL CONTRACTOR IS TO COMPLETE FINAL CONNECTION AFTER CONTRACTOR SHALL SATISFY CODE REQUIREMENTS AS A MINIMUM 0� 5 �
<br /> DATA RACK AND NETWORK INSTALLATION. THE GENERAL CONTRACTOR MOUNT OWNER FURNISHED SPEAKERS WHERE SHOWN ON INTERIOR STANDARD WITHOUT ANY EXTRA COST TO STARBUCKS. 0- L 0- Lo U)
<br /> IS TO CONTACT LCP VENDOR TO VERIFY SYSTEM OPERATION AND REFLECTED CEILING PLANS AND IN COORDINATION WITH ALL PLANS,
<br /> TROUBLESHOOT IF REQUIRED. DETAILS AND MANUFACTURER'S INSTALLATION REQUIREMENTS. PERMITS AND FEES STORE #: 13402
<br /> INSTALL AND CONNECT OWNER FURNISHED WIRING SYSTEM BETWEEN THE ELECTRICAL CONTRACTOR SHALL PROCURE AND PAY FOR ALL
<br /> ALL SPEAKERS AND THE OWNER PROVIDED MUSIC SYSTEM. SET PERMITS, FEES, AND INSPECTIONS NECESSARY TO COMPLETE THE PROJECT #: 39714-051
<br /> WATTAGE TAP ON EACH SPEAKER'S ROTARY SWITCH PER TAP SETTINGS ELECTRICAL WORK.
<br /> NOTED ON PLANS. CASEWORK CONCEPT: CORE
<br /> WARRANTY ISSUE DATE:
<br /> THE ELECTRICAL CONTRACTOR SHALL UNCONDITIONALLY WARRANT PROGRAM MANAGER: M. DREBIKA
<br /> ALL WORK TO BE FREE OF DEFECTS IN MATERIAL AND WORKMANSHIP STORE DESIGNER: S. BELVINS
<br /> FOR A PERIOD OF ONE (1)YEAR FROM THE DATE OF FINAL ACCEPTANCE LEED®AP: N/A
<br /> SCOPE OF WORK BY STARBUCKS AND WILL REPAIR OR REPLACE ANY DEFECTIVE WORK
<br /> PROMPTLY AND WITHOUT CHARGE AND RESTORE ANY OTHER EXISTING CHECKED BY:
<br /> WORK DAMAGED IN THE COURSE OF REPAIRING DEFECTIVE MATERIALS ACIES PROJECT#: 190480
<br /> - COMPLETE INTERIOR LIGHTING AND LIGHTING CONTROLS CHANGES. AND WORKMANSHIP. ACIES DESIGNER BY: HT
<br /> - POWER CHANGES FOR NEW FOOD SERVICE EQUIPMENT IN THE BAR
<br /> - NEW EMERGENCY AND EXIT LIGHTING. LEED ACIES CHECKED BY: TG
<br /> -ALL PANELS ARE EXISTING TO REMAIN. ALL WORK, MATERIALS AND EQUIPMENT SHALL MEET LEED
<br /> REQUIREMENTS &CODE. IN CASE OF CONFLICT, THE HIGHER Revision Schedule
<br /> STANDARD SHALL APPLY.
<br /> Rev Date By Description
<br /> LANDLORD REQUIREMENTS
<br /> PRIOR TO BID: THE CONTRACTOR SHALL COORDINATE WITH LANDLORD/
<br /> BUILDING OWNER FOR ANY CONSTRUCTION REQUIREMENTS/ SHEET TITLE:
<br /> SPECIFICATIONS. IF LANDLORD/ BUILDING OWNER DOES HAVE ELECTRICAL NOTES
<br /> REQUIREMENTS, CONTRACTOR SHALL BECOME COMPLETELY FAMILIAR
<br /> WITH REQUIREMENTS/SPECIFICATIONS AND ADHERE TO THEM. WHERE
<br /> LANDLORD/ BUILDING OWNER REQUIREMENTS ARE MORE STRINGENT
<br /> THAN SHOWN IN THESE PLANS (IN THE OPINION OF THE ENGINEER). SCALE: AS SHOWN
<br /> LANDLORD/ BUILDING OWNER REQUIREMENTS SHALL GOVERN.
<br /> SHEET NUMBER:
<br /> E-001