Laserfiche WebLink
SVJtiCB, January 2002 Page— of <br /> 4. SPILLIOVERFILL CONTAINMENT BOXES SS#: 6020 Date: VWC005 <br /> Facility is Not I Equipped With S ill/Overfill Containment Boxes ❑ <br /> S ililOverfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer -1 Hndustry Standard ❑Professional Engineer <br /> ❑Other(Spec;,$t) <br /> Test Method Used: ❑Pressure ❑ Vacuum VMydrostatic <br /> ❑Other(Specty) <br /> Test Equipment Used: v 7t, Equipment Resolution: <br /> Spill Box# SpillBoxtl a ,. SpillBox# It SpWBeac#� <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pre ssurelvacuumlwater and _ <br /> staqing test: <br /> Test Start Time: .' 3 ® 3 p q'3 cJ 3C <br /> Initial Reading(RD: <br /> Test End Time: <br /> Final Reading(Rp): <br /> Test Duration: <br /> Change in Reading(Rp-Rb: <br /> Pass/Fail Threshold or <br /> Criteria: <br /> ... r : - gra �_- z .. tis z- +.; ..: �3� .; cam.. .a � �� �z' r�•� z ;. <br /> p_ ����f wry rt •._k' <br /> Comments—(include information on repairs made prior to testing,and recommended follow-Lpfor failed teats) <br />