My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2004 - 2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2004 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 12:14:14 PM
Creation date
5/1/2020 9:04:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2007
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA.CB, January 2002 Page f of <br /> 4. SPILL/OVERFILL CONTAINMENT BOXES SS#: 6020 Date: 9/7/2005 <br /> FacilityisNotEquip edWith Spill/Overfill Containment Boxes 0 <br /> S ill/Overfill Containment Boxes are Present,but were Not Tested 0 <br /> Test Method Developed By: 0Spill Bucket Manufacturer dustryStandard 0Professional Engineer <br /> 0 Other(Spect&) <br /> TestMeilhodUsed: ❑Pre ssure 0 Vacuum ydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: / Equipment Resolution: pv <br /> MINOR <br /> Spill Box€€ Spill Box# Spill Spill Box 9 <br /> Bucket Diameter: <br /> Bucket Depth: t Z Z <br /> Wait time between applying <br /> pressurelvacuumdwater and <br /> Starting test: `^ �� 5 A' <br /> T e st Start Time: <br /> Initial Re ading(RD: <br /> Test End Time: G; d i G;3 U <br /> Final Reading(RF): <br /> Test Duration: A <br /> Change in Reading(Rp-RD: <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Tett'R�es» t:: b Fail Pass U Fail. U Pass U Pail: ,Ps�ss .Fail <br /> Comments—(include irfbrmation on repairs made prior to tesh'n& and recommended follow-bp for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.