Laserfiche WebLink
saw <br /> UNDERGROUND STORAGETANK <br /> MONITORING PIAN-PAGE 1 <br /> TYPE OF ACTION Z I NEW PLAN ❑ 2 CHANGE OF INFORMATION Mo i <br /> M02 <br /> PLAN TYPE Z MONITORING IS IDENTICAL FOR AL1 USTS AT THIS FACILITY <br /> (Check one item only) El THIS PLAN COVERS ONLY THE FOLLOWINGUST SYSIEM(S): ------ <br /> . . ....... .. ...... <br /> -—-------- <br /> ISO -PRW-11".1 <br /> .FACILITY ID#(Agency Use Only) 1: <br /> FACILITYNAI%E ARCO#06020 <br /> FACILITY SITE ADDRESS 1711 W.YOSEMITE M01 CITY MANTECA <br /> M05 <br /> ION, <br /> MAN <br /> AV <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g,sensors,probes,line leak detectors,etc.)be performed in M06 <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent Such work must be perfoirned by qualified personnel <br /> MONI IORING EQUIPMENT IS SERVICED 1.ANNUALLY C] 99.OTHER(Specify): M07 <br /> 111. MONITORING LOCATIONS .'. ' <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i e,location of each sensor. <br /> line leak detector,monitoring system control panel etc) If you already have a diagram(e g,current UST'Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan mg,etc.)which shows all required information,include it with this plan. <br /> IV T-' 90 N- ITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M10 <br /> 1 CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAUL I(S) <br /> SECONDARY CONTAINMENT IS: 0 a DRY ❑ b LIQUID FILLED ❑ c UNDER PRESSURE E] d UNDER VACUUM M" <br /> PANEL MANUFACTURER: Veeder Root M" MODEL#: ILS 350 M13 <br /> LEAK SENSOR MANUFACTURER: Veeder Root M14 MODEL#(S): 794390-409 M15 <br /> El 2 AUTOMATIC TANK GAUGING(ATO)SYSTEM USED TO MONITOR SINGLE WALL ANK(S) <br /> PANEL MANUFACTURER: M16 MODEL#: Mn <br /> IN-TANK PROBE MANUFACTURER: MIS MODEL#(S): M19 <br /> LEAK IEST FREQUENCY: El a CONTINUOUS 0 b DAILY/NIGHTLY El c WEEKLY M20 <br /> C] d MONTHLY El e OTHER(Specify): M21 <br /> PROGRAMMED TESTS: El a 0 1 g p h [I b 0 2 g p h ❑ c OTHER(Specify); M22 <br /> 1423 <br /> ❑ 3 INVENTORY RECONCILIATION ❑ a MANUAL PER 23 CCR§2646 El b STATISTICAL PER 23 CCR§2646 1 M24 <br /> ❑ 4 WEEKLY MANUAL TANK GAUGING(MIG)PER 23 CCR§2645 <br /> I ES I rNG PERIOD: [] a 36 HOURS El b 60 HOURS M25 <br /> ❑ 5 INIEGRITYrEST[NOPER23CCR§26431 <br /> TESIFREQUENCY: E3 a ANNUALLY El b BIENNIALLY 0 c OTHER(Specify): M26 M27 <br /> ❑ 6 VISUAL MONITORING DONE: El a DALLY C1 b WEEKI.Y(Requires agency approval) <br /> ❑ 99.OTHER(Spec*): M28 <br /> V..... PIPE.M0 ORING <br /> MT . .. ...... <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M30 <br /> 1 CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)tIRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: a DRY [I b LIQUID FILLED ❑ c UNDERPRESSURE [j d UNDER VACUUM M" <br /> PANEL MANUFACTURER: Veeder Root M32 MODEL ILS 350 M33 <br /> 4 <br /> LEAK SENSOR MANUFACTURER: Veeder Root M3MODEL#(S): 794380-323 M35 <br /> WILL APIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i e.TURBINE)SHUTDOWN? 0 a YES ❑ b NO M16 <br /> WILL FAILURE/DISCONNECI ION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? E a YES ❑ b NO m3' <br /> 2 MECHANICAL LINE LEAK DETECTOR (MLLD) THAI ROUTINELY PERFORMS 30 g ph LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLDMANUFACTURER(s): FE PEIRO(87 tank) M" MODEL#(S): MLD(87tank) M39 <br /> 3 ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUITNELY PERFORMS 3 0 g p h LEAK TESTS <br /> ELLD MANUFACTURER: RED JACKE 1(89.&91 tank) M40 MODEL#: XLD(89&91 tank) 1441 <br /> PROGRAMMED LINE INTEGRITY TESTS: F_] a MINIMUM MONTHLY 0 2 g p h C] b MINIMUM ANNUAL 01 g.p h 1442 <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? a YES El b NO M4' <br /> WILL ELLD FAIL UREMISCONNECT ION TRIGGER AUTOMATIC PUMP SHUTDOWN? a YES 0 b NO M" <br /> ❑ 4 INIEGRITYIESIING <br /> IESIFREQUENCY- ❑ a ANNUALLY ❑ b.EVERY 3 YEARS E] c OTHER(Specify) M45 M46 <br /> ❑ 5 VISUAL MONITORING DONE: ❑ a DAILY ❑ b WEEKLY* C] C.MTN.MoNnny&EACH TRAE SYSTEM OPERATED" M47, <br /> •Requires;agency approval **Allowed for monitoring of unburied emergency generator fuel piping only per HSC 1125281 5(b)(3) <br /> ❑ 6 PIPING IS SUCTION PIPING MEEIINO ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7 NO PRODUCT OR REMGIE FILL PIPING IS CONNECTED TO THE UST(g) <br /> El 99.OTHER(Specify) <br /> Arco#06020,Belshire Environmental Services Page 1 of 5 <br />