Laserfiche WebLink
IV. SAFETY PLAN <br /> 1. Attached hereto is Schedule #2 which is a list of all PPE, safety, first aid, <br /> and fire equipment that shall be maintained at the Site. <br /> 2. The following guidelines shall be implemented and followed as part of this <br /> Clean Closure Plan. <br /> A. Personal Prolective Equipment "PPE"l. <br /> 1. An examination of the potential hazardous materials of the Site reveals that <br /> the only likely dangers to workers would be from splashes of materials that may come into <br /> contact with skin, eyes, or mouth. There appears to be no risk to the lungs due to <br /> atmospheric contamination given the types of chemicals previously used on the Site, the age <br /> of the Site, and the typical wind patterns of the area. The Site contains significant <br /> amounts of wood, nails, and jagged metal edges causing a significant risk of puncture <br /> wounds and cuts. Consequently,the Owner/Operator pursuant to its evaluation of the Site <br /> and the potential hazards therein (as per 29 CFR 1910.120) has selected the following PPE <br /> from which each individual worker shall select the appropriate equipment: <br /> Goggles/face shield <br /> Particle filter breathing mask <br /> Tyrek suits <br /> Rubber gloves <br /> Steel-toed/steel-shank shoes <br /> Hard hats <br /> 2. Should larger than residue amounts of any hazardous material be encountered <br /> that pose a higher risk than anticipated, then the Supervisor shall insure that each worker <br /> is aware of the condition so that he or she can evaluate that situation and select additional <br /> PPE if necessary. Three (3) positive pressure breathing apparatus shall be available at the <br /> site. <br /> 3. The gloves, coveralls, and particle filter masks shall only be used once and <br /> then disposed of. The boots and face shields shall be used throughout and stored in the <br /> change room lockers provided by the Owner/Operator after required decontamination. <br /> 4. All PPE shall be donned at the beginning of each work day and remain on <br /> while work is being done. <br /> 7 <br />