My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0524571
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 2:35:36 PM
Creation date
5/1/2020 2:15:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524571
PE
2960
FACILITY_ID
FA0016482
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
932
Direction
S
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/11
CURRENT_STATUS
01
SITE_LOCATION
932 S FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FW: ripon farm service work pla Page 1 of 2 <br /> Vicki McCartney [EH] <br /> From: John Cooper Dcooper@gercorp.com] <br /> Sent: Friday, July 24, 2009 1:28 PM <br /> To: 'Clay Rosson' <br /> Subject: FW: ripon farm service work plan <br /> -----Original Message----- <br /> From:Amy Terrell [mailto;aterre110)wa...terboards.ca.2ov._] <br /> Sent:Wednesday,July 22,2009 4:32 PM /J <br /> To:vmccartney@sjcehd.com // <br /> Cc:jcooper@gercorp.com;Jeff Hawkins �0 9!� <br /> Subject:ripon farm service work plan <br /> Good day Vicki, <br /> As we discussed this morning,I'm reviewing a revised investigative <br /> work plan for the Ripon Farm Service facility at 938 Frontage Road in <br /> Ripon. The 7 July 2009 work plan completely replaces the 12 <br /> September 2008 work plan and my invalidates my October 08 approval <br /> letter. So,a fresh look: <br /> I'm providing a link to the work plan for your convenience(at end of <br /> this email),and providing my preliminary review of it. A conditional <br /> concurrence letter is winding its way through the institutional process <br /> here,and will eventually end up on your desk. Meanwhile,I've <br /> excerpted sections of that draft letter here,to let you know that I'm <br /> very happy with their proposed plan,and have only minor adjustments to <br /> make. <br /> "California Regional Water Quality Control Board,Central Valley Region <br /> (Central Valley Water Board)staff has received the 7 July 2009 Site <br /> Characterization Work Plan Phase 11(Revised Work Plan),prepared by <br /> Genesis Engineering and Redevelopment.This work plan replaces the Site <br /> Characterization Work Plan Phase II dated 12 September 2008,which <br /> Central Valley Water Board staff conditionally concurred with in a <br /> letter dated 17 October 2008. This revised work plan incorporates the <br /> conditional elements specified in Central Valley Water Board staff's <br /> October concurrence letter,and addresses investigative items <br /> specifically requested in the 28 May and 9 July 2008 letters. <br /> The Revised Work Plan includes the following: <br /> • Seven shallow monitoring wells distributed along the north and <br /> south property boundaries. <br /> • Ten shallow borings sampled for nitrogen about every five feet <br /> to first groundwater,about 25 feet below ground surface(bgs) <br /> • Five deep borings sampled for nitrogen about every 20 feet <br /> extending to the depth of the on-site water supply well,about 195 feet <br /> 7/27/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.